Type : Bid Notification
Each facility includes a backwash hood (including injector assemblies), bridge structure, bridge drive assembly, operations deck, pump house, deck drive assembly, backwash pump and piping, backwash trough, surface wash pump and piping, hydraulic system, exhaust fan and heater, electrical, instrumentation, controls and other components that form a complete and operable facility.