Search results for: point configuration and installation

Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Showing opportunity 1 - 10 of 540
  • Extreme Wireless Access Point Configuration and Installation

    Type : Bid Notification
    Due : 30 Sep, 2023 (in 10 months)
    Posted : 20 months ago
    Started : 24 Mar, 2021 (20 months ago)

    Dr. Diana L. Greene, Superintendent of Schools EVERY SCHOOL. EVERY CLASSROOM. EVERY STUDENT. EVERY DAY. Duval County Public Schools www.duvalschools.org Purchasing Services PH: (904) 858-4848 1701 Prudential Drive, Suite 322 FAX: (904)858-4868 Jacksonville, FL 32207 September 19, 2022 Step CG, LLC Danny Poindexter 50 E Rivercenter Blvd #900 Covington, KY 41011 RE: RFP No. 12-21/LM, EXTREME WIRELESS ACCESS POINT CONFIGURATION AND INSTALLATION The Superintendent of Duval County Public Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM. This is the first renewal ...

    From: Duval County Public Schools (School)
  • Extreme Wireless Access Point Configuration and Installation

    Type : Bid Notification
    Due : 30 Sep, 2022 (2 months ago)
    Posted : 14 months ago
    Started : 21 Sep, 2021 (14 months ago)

    Item # Description Configuration & Installation cost per Item 1 Configuration and Installation of Single Access Point $ ______________ Per Item RFP No. 12-21/LM, Extreme Wireless Access Point Configuration and Installation. Schools to be Installed. This is the anticipated number of items and locations. The number of items and locations are not guaranteed.

    From: Duval County Public Schools (School)
  • Wireless Access Point Installation and Configuration

    Type : Bid Notification
    Due : 07 Mar, 2022 (8 months ago)
    Posted : 10 months ago
    Started : 28 Jan, 2022 (10 months ago)

    Project Title Wireless Access Point Installation and Configuration Invitation # IT RFP 22-01 Bid Posting Date 01/28/2022 6:51 AM (PST) Project Stage Bidding Bid Due Date 03/07/2022 4:00 PM (PST) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Cost File Response File Type of Award Lump Sum Categories 541511 - Custom Computer Programming

    From: City of San Marcos (City)
  • Seymour Johnson Air Force Base-Berkeley Gate Construction

    Type : Bid Notification
    Due : 29 Jun, 2021 (17 months ago)
    Posted : 21 months ago
    Started : 08 Jul, 2021 (17 months ago)

    Berkeley Gate is the primary Installation Entry Control Point and runs 24/7 operations. It is used by Privately Operated Vehicles and visitors and experiences high volumes of traffic during peak hours. There are two inbound and two outbound lanes, the second inbound lane is only used during peak hours. In its current configuration, the entry control point does not meet Security Forces requirements critical to the safety of the installation.

    From: Federal Government (Federal)
  • 65--Patient Lifts and Installation in VA Reno CLC

    Type : Bid Notification
    Due : 03 Apr, 2019 (about 3 years ago)
    Posted : about 3 years ago
    Started : 27 Mar, 2019 (about 3 years ago)

    Planning and Installation Contractor will provide evaluation of spaces where ceiling lifts are needed and submission of plans to VASNHCS Engineering service, to assure that workable versions are installed and comply with VA design requirements and relevant standards. This includes planning and coordination to ensure ceiling lifts work with other ceiling structures, including booms.

    From: Federal Government (Federal)
  • USDA FS Supply and Install Service Body and Transfer Drill

    Type : Bid Notification
    Due : 10 Sep, 2022 (2 months ago)
    Posted : 3 months ago
    Started : 25 Aug, 2022 (3 months ago)

    THIS INCLUDES REMOVING FRAME AND SUPPORT COMPONENTS FROM OLD VEHICLE, REFURBISHING AND REINSTALLING ON NEW SERVICE BODY. - REINFORCE SERVICE BODY AT DRILL MOUNTING AREA FOR SAFE OPERATION OF DRILL AND DURING TRANSPORT TO INCLUDE INSTALLATION OF SUPER SPRING KIT FOR LEVELING AND STABILITY - EIGHT-POINT MOUNTING - THREE YEAR BULKHEAD TO BUMPER WARRANTY - INSTALLED ON FOREST SERVICE SUPPLIED CAB AND CHASSIS - Install factory backup camera on bumper area

    From: Federal Government (Federal)
  • Seymour Johnson Air Force Base-Berkeley Gate Construction

    Type : Award
    Due : 13 Oct, 2021 (13 months ago)
    Posted : 14 months ago
    Started : 28 Sep, 2021 (14 months ago)

    Berkeley Gate is the primary Installation Entry Control Point and runs 24/7 operations. It is used by Privately Operated Vehicles and visitors and experiences high volumes of traffic during peak hours. There are two inbound and two outbound lanes, the second  Inbound lane is only used during peak hours. In its current configuration, the entry control point does not meet Security Forces requirements critical to the safety of the installation.

    From: Federal Government (Federal)
  • Access Point Installation at Various Sites

    Type : Bid Notification
    Due : 25 May, 2022 (6 months ago)
    Posted : 6 months ago
    Started : 09 May, 2022 (6 months ago)

    Project Title Access Point Installation at Various Sites Invitation # Bid No. 5416 Bid Posting Date 05/09/2022 11:09 AM (PDT) Project Stage Bidding Bid Due Date 05/25/2022 2:00 PM (PDT) Response Format Paper Project Type Bid Response Types Line Items Subcontractor Type of Award Lump Sum Categories 72500 - Radio Communication, Telephone, And Telecommunication Equipment

    From: Kern High School District (School)
  • SLAM UUV Statistical Support

    Type : Bid Notification
    Due : 03 May, 2019 (about 3 years ago)
    Posted : about 3 years ago
    Started : 18 Apr, 2019 (about 3 years ago)

    a posterior distribution that the Contractor will use to make inferences on optimal point configurations.

    From: Federal Government (Federal)
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived