Type : Bid Notification
Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM.
Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM.
AND INSTALLATION\n\nThe Superintendent of Duval County Public Schools renewed the contract for Extreme Wireless Access Point\nConfiguration and Installation, RFP No.12-21/LM.
Items listed in this requirement; ITEM # PRODUCT DESCRIPTION QTY H8051PB Voluson P8 2D BT22 1 H4000SR 4C-RS Convex Array Probe 1 H48691PJ IC9-RS Probe 1 H43192LH Battery Pack, Late Point Configuration Center Only (Lithium ION) 1 H44972LD BW Printer Kit 1 Description: High definition, diagnostic ultrasound system for ob-gyn (Women s Health). The system supports black and white Doppler capability through all convex and linear sector transducers.
of a new MCC (MCC-R740) complete with all required systems and components; (h) the provision of motor starter control and programming; (i) the provision of configuration set points and programming that are Site specific for each motor starter, instrument, intelligent motor starter; and all other electrical systems; (j) the provision, installation, and incorporation of a new one hundred twenty (120)/two hundred eight (208) V panel (PNL-R741) and transformer
Suppliers shall provide pricing on Wi Fi 6 equipment and turnkey installation and configuration for access point upgrades into our existing network at multiple locations throughout the District. Submittal for this Request For Proposal will be online at http://lubbockisd.ionwave.net.
Berkeley Gate is the primary Installation Entry Control Point and runs 24/7 operations. It is used by Privately Operated Vehicles and visitors and experiences high volumes of traffic during peak hours. There are two inbound and two outbound lanes, the second inbound lane is only used during peak hours. In its current configuration, the entry control point does not meet Security Forces requirements critical to the safety of the installation.
THIS INCLUDES REMOVING FRAME AND SUPPORT COMPONENTS FROM OLD VEHICLE, REFURBISHING AND REINSTALLING ON NEW SERVICE BODY. - REINFORCE SERVICE BODY AT DRILL MOUNTING AREA FOR SAFE OPERATION OF DRILL AND DURING TRANSPORT TO INCLUDE INSTALLATION OF SUPER SPRING KIT FOR LEVELING AND STABILITY - EIGHT-POINT MOUNTING - THREE YEAR BULKHEAD TO BUMPER WARRANTY - INSTALLED ON FOREST SERVICE SUPPLIED CAB AND CHASSIS - Install factory backup camera on bumper area