Search results for: point configuration and installation

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 993
  • Extreme Wireless Access Point Configuration and Installation

    Type : Bid Notification

    Due : 30 Sep, 2024 (in 5 months)
    Posted : about 3 years ago
    Started : 24 Mar, 2021 (about 3 years ago)

    Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM.

    From: Duval County Public Schools (School)

  • Extreme Wireless Access Point Configuration and Installation

    Type : Bid Notification

    Due : 30 Sep, 2023 (6 months ago)
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    AND INSTALLATION\n\nThe Superintendent of Duval County Public Schools renewed the contract for Extreme Wireless Access Point\nConfiguration and Installation, RFP No.12-21/LM.

    From: Duval County Public Schools (School)

  • 6525--GE Voluson Ultrasound

    Type : Bid Notification

    Due : 19 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 13 Dec, 2023 (4 months ago)

    Items listed in this requirement; ITEM # PRODUCT DESCRIPTION QTY H8051PB Voluson P8 2D BT22 1 H4000SR 4C-RS Convex Array Probe 1 H48691PJ IC9-RS Probe 1 H43192LH Battery Pack, Late Point Configuration Center Only (Lithium ION) 1 H44972LD BW Printer Kit 1 Description: High definition, diagnostic ultrasound system for ob-gyn (Women s Health). The system supports black and white Doppler capability through all convex and linear sector transducers.

    From: Federal Government (Federal)

  • MacLean Regional Pumping Station Valve House Electrical Upgrade

    Type : Bid Notification

    Due : 03 May, 2024 (in 6 days)
    Posted : 29 days ago
    Started : 27 Mar, 2024 (1 month ago)

    of a new MCC (MCC-R740) complete with all required systems and components; (h) the provision of motor starter control and programming; (i) the provision of configuration set points and programming that are Site specific for each motor starter, instrument, intelligent motor starter; and all other electrical systems; (j) the provision, installation, and incorporation of a new one hundred twenty (120)/two hundred eight (208) V panel (PNL-R741) and transformer

    From: MerX (Federal)

  • 2022 E-Rate Wireless Access Point Upgrade

    Type : Bid Notification

    Due : 15 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Oct, 2021 (about 2 years ago)

    Suppliers shall provide pricing on Wi Fi 6 equipment and turnkey installation and configuration for access point upgrades into our existing network at multiple locations throughout the District.    Submittal for this Request For Proposal will be online at  http://lubbockisd.ionwave.net.  

    From: Lubbock Independent School District (School)

  • Seymour Johnson Air Force Base-Berkeley Gate Construction

    Type : Bid Notification

    Due : 29 Jun, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 08 Jul, 2021 (about 2 years ago)

    Berkeley Gate is the primary Installation Entry Control Point and runs 24/7 operations. It is used by Privately Operated Vehicles and visitors and experiences high volumes of traffic during peak hours. There are two inbound and two outbound lanes, the second inbound lane is only used during peak hours. In its current configuration, the entry control point does not meet Security Forces requirements critical to the safety of the installation.

    From: Federal Government (Federal)

  • USDA FS Supply and Install Service Body and Transfer Drill

    Type : Bid Notification

    Due : 10 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 25 Aug, 2022 (20 months ago)

    THIS INCLUDES REMOVING FRAME AND SUPPORT COMPONENTS FROM OLD VEHICLE, REFURBISHING AND REINSTALLING ON NEW SERVICE BODY. - REINFORCE SERVICE BODY AT DRILL MOUNTING AREA FOR SAFE OPERATION OF DRILL AND DURING TRANSPORT TO INCLUDE INSTALLATION OF SUPER SPRING KIT FOR LEVELING AND STABILITY - EIGHT-POINT MOUNTING - THREE YEAR BULKHEAD TO BUMPER WARRANTY - INSTALLED ON FOREST SERVICE SUPPLIED CAB AND CHASSIS - Install factory backup camera on bumper area

    From: Federal Government (Federal)