Search results for: pol infrastructure and fuel

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 65
  • KC-46A FUEL POL INFRASTRUCTURE AND FUEL YARD

    Type : Bid Notification

    Due : 02 Mar, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 24 Feb, 2023 (14 months ago)

    Amendment 0008 hereby: Revises Section 33 52 43.13. Revises Drawing Sheets MF510 and MF655. The proposal due date is extended from 28 February 2023 to 02 March 2023.

    From: Federal Government (Federal)

  • FY21_DODPOLWorldwideConstruction

    Type : Bid Notification

    Due : 08 Jul, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 07 Jun, 2019 (about 4 years ago)

    Note these must be infrastructure such as Refueler Parking Lot and Containment and Dikes (oil water separators, remote basins, joint sealant, etc), Fuels Operations Facilities, Fuels Labs, Metal Coatings systems subject to SSPC or NACE, Fuel Infrastructure Canopies, Cathodic Protection of Fuel Systems, Motor Control Centers, Emergency Fuel Shut Off Systems, etc. ii.

    From: Federal Government (Federal)

  • Strategic Advisory and Technical Support Services

    Type : Bid Notification

    Due : 08 Jun, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 19 May, 2022 (23 months ago)

    Within the FSD, the Program Management Division (PMD) has a primary responsibility for the planning, budgeting, and funding of sustainment, repair and modernization projects that support the readiness of DOD fixed fuel infrastructure.  The FSD asset portfolio includes over 10,000 POL assets valued at over forty-nine billion dollars. These assets include, but are not limited to, fuel storage tanks, pipelines, POL buildings, and piers.

    From: Federal Government (Federal)

  • Request for Qualifications (RFQ) to provide American Petroleum Institute (API) 653 Repairs of Fuel Storage Tanks at Thule Air Base, Greenland

    Type : Bid Notification

    Due : 08 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 01 Nov, 2023 (5 months ago)

    The refueling barge comes to Thule once per year in June to July, and repairs must be completed after refueling barge delivery in summer of 2024.For purposes of this RFQ, if you represent a Danish or Greenlandic firm that specializes in repair services for US DoD POL Infrastructure, please submit the following information to support your firm’s qualifications:Does the contractor have sufficient tank experience repairing fuel tanks?

    From: Federal Government (Federal)

  • AE23POL_MATOC_DRAFT_SYNOPSIS_INPUT

    Type : Bid Notification

    Due : 15 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 16 Feb, 2022 (about 2 years ago)

    It also includes infrastructure design for POL facility-related site utilities, refueler truck parking areas, containment areas (pavement and drainage basin design), fuel pits, fill stands, and for POL facility-related special designs including cathodic protection, fire protection, special coatings and paints, and demolition of existing POL buildings.

    From: Federal Government (Federal)

  • $499M Fuels Replacement DBB MATOC

    Type : Bid Notification

    Due : 23 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Oct, 2019 (about 4 years ago)

    under this MATOC primarily includes, but is not limited to: replacement of aging fuel infrastructure and/or components, repair of storage tanks and containment areas, POL system upgrades and maintenance (modernization), facility demolition, construction of fuels support facilities, regulatory compliance, and design to support the construction work projects.

    From: Federal Government (Federal)

  • DRAFT RFP FOR FY18 MCON PROJECT P-661, NAVY-COMMERCIAL TIE-IN HARDENING, JOINT REGION MARIANAS, GUAM

    Type : Bid Notification

    Due : 03 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 16 Feb, 2021 (about 3 years ago)

    draft P&S is for the construction (design-bid-build) of hardened shelters over and around a new Navy-Commercial Tie-In facility, which is one component in the Navy’s Petroleum Oil Lubricant (POL) infrastructure in Guam. 

    From: Federal Government (Federal)