Type : Award
Repair surface slides 7 located at approximate station 60+32 to 61+40 and slide 13 located at approximate station 11+00 to 13+00 at Joe Pool Dam Lake.
Repair surface slides 7 located at approximate station 60+32 to 61+40 and slide 13 located at approximate station 11+00 to 13+00 at Joe Pool Dam Lake.
Interim Repairs for Water Control Structure at Echo Lake Dam Water Security Agency WSA-2024-25OE-0007 Apr 19, 2024 10:00 AM CST May 21, 2024 04:00 PM CST Open
Bid Title:Fair Lake Dam Improvements Category:Soil and Water ConservationStatus:Open Description: Please see the related documents for all information.
Hanson Dam Additional Water Storage Project - Fish Passage Facility. Please refer to the attached solicitation documents, specifications, and attachments for all details. Documents included with this announcement: W912DW24R0004 RFP - Howard A.
My OGS Account Information Design & Construction Bid Documents Available: Project 47057 TitleDecommission Mirror Lake DamLocationMirror Lake Dam Lake Street Herkimer, NY (Herkimer County) Pre-Bid Meeting05/23/24Meeting LocationNYS DEC, 225 N.
Terms:#1 Nov 1, 2023 Oct 31, 2024 Project: Bergen County, NJStatus: ActiveVendor: SPARWICK CONTRACTING INCExtendable: NoDescription:Resolution Number:1275-23Bid Number:BC-C-23-024NJCPA Coop:No#11BCCP Coop:NoCounty Department:ParksResolution Award Date:01 Nov 2023Opportunity: Darlington Lake Dam View OpportunityFilesShow/Hide Download grid export Drag here to set row groupsDrag here to set column labels Name Type Date Created Action Proposal.pdfOtherNov
Decommission Mirror Lake Dam Agency: General Services, NYS Office of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:04/23/2024 Due Date: 06/05/2024 Ad Type:General