Type : Bid Notification
Remove remaining asphalt from fire line project inside the Sally Port area – install 1 – 1⁄2” of new asphalt. Install 8” of compacted lime rock where lime rock was dug out for the fire line. Where the concrete was removed from ramp for the fire line needs to be replaced with 6” of concrete. Stripe five (5) parking spaces E-Bidding No Legal Ad Please select either the View or Edit button to manage legal ad.