Type : Bid Notification
Beam Position Monitor (BPM) system
Beam Position Monitor (BPM) system
FERMI RESEARCH ALLIANCE, LLC (FRA) REQUESTS YOUR FIRM FIXED PRICE PROPOSAL FOR THE FOLLOWING "Beam Position Monitor (BPM) Assembly Per Drawing - F10152143_B_DWG1" IN ACCORDANCE WITH THE TERMS & CONDITIONS AND ATTACHMENTS INCORPORATED INTO THIS REQUEST FOR PROPOSAL BY REFERENCE.*See zipped file "RFP346236 for details*
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.SLAC has a requirement for a quote of the following product from Instrumentation Technologies:Quantity: 19, LSEL1.000.001 Libera Spark EL (500MHz)Quantity: 3, PKIT1.000.001 Mounting rack for 19'' instruments (8 vertical)The award will be made based upon the Lowest Price Te...
Beam Position Monitors and Piece Parts
The Cable Assemblies will be used to carry beam position monitor radio frequency electrical signals through the cryostat insulating vacuum, from the liquid helium cooled cryogenic BPM feedthrough to the room temperature insulating vacuum to air feedthrough.
Better position the City to monitor and verify energy usage within City facilities and provide actionable data to facilitate DER deployment. Other Details Notes If vendors are unable to provide hard copy proposal packages with wet signatures, you may submit an electronic signed copy (using DocuSign, Adobe, or a scanned signature) through the PlanetBids portal by the Closing Date and Time.
BSI is therefore in the best position to monitor and advise on plan implementation, including reviewing and updating a risk metric framework that is a core component of the Board's plan, and which risk metric framework is unique to BSI. Projected Start Date and Expiration Date: November 2021, End date of November 2022, with one or more renewal options.