Type : Contract
POWER CONTROL BOARD ASSEMBLY Solicitation ID/Procurement Identifier: 70Z02321Q70000H00 Ultimate Completion Date: Wed Mar 01 18:00:00 GMT 2023
POWER CONTROL BOARD ASSEMBLY Solicitation ID/Procurement Identifier: 70Z02321Q70000H00 Ultimate Completion Date: Wed Mar 01 18:00:00 GMT 2023
The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is seeking Firm Fixed Price (FFP) quotes for twelve (12) Wireless Underwater Tracking System (WUTS) Power Control/Front End Board Assemblies , as follows: CLIN 0001 WUTS Power Control/Front End Board Assembly (Offerors shall QTY: 12 Each meet the Minimum Specifications and fill out the Minimum Specification Sheet attached to this RFQ).
Six each of NSN: 6130-01-591-5129ZA.This is a 100% small business set aside.
Noun: Control AssemblyNSN: 2520-01-677-2591I/A/FOB: S/S/DQty: Base: 46, Option: 100%FOB: DestinationPkg: Military/ AINSP/ACCP: Origin/OriginTechnical Data Package IS NOT available.Solicitation release to web will be approximately 26 April 2024; close date approximately 25 May 2024. See the solicitation for actual closing date. Once available, the solicitation can be downloaded from Sam.gov.
Supply Unit (ATEX)1 x Sensor Interface Board PCB 2000 SMT1 x Power Control PCB Assembly Spare1 x Kit, FusesEXT WARRANTY - 2YR SP1000US 1 EAExtended Warranty - 2 Year per 1 EAThis package extends the standard analyzer factory warranty from 12 to24 months.Warranty period begins on the day your Servomex analyzer was shipped.All equipment covered by this program must be returned to the ServomexService Center for warranty service.
Protect existing utilities, include traffic control, business open signs, walk direction signs around construction area, remove existing sidewalk, ramp, curb, gutter, and asphalt. Construct new ADA ramp, 4” sidewalk, ADA handrails, retaining curb, curb transition, curb & gutter, sawcut & overlay full depth AC pavement, reconstruct cross-gutter, paint curbs, install decomposed granite.
SEE ATTACHED SOLICITATION.