Search results for: power feeder replacement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 69
  • Power Feeder Replacement

    Type : Bid Notification

    Due : 26 Sep, 2022 (19 months ago)
    Posted : 19 months ago
    Started : 21 Sep, 2022 (19 months ago)

    Power Feeder Replacement, Bear Creek Dam, Colorado. 

    From: Federal Government (Federal)

  • LSD Underground Feeder and Fiber Replacement

    Type : Contract

    Due : 29 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 01 Sep, 2023 (8 months ago)

    LSD Underground Feeder and Fiber Replacement Agency: Power Authority of New York Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Professional Services Issue Date:09/01/2023 Due Date: 09/29/2023 Ad Type:General

    From: New York State Contract Reporter (City)

  • REPLACEMENT OF EXISITING POWER FEEDERS FROM THE POWERHOUSE TO NIC

    Type : Bid Notification

    Due : 21 Oct, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Sep, 2020 (about 3 years ago)

    The NYC Department of Correction (DOC) is seeking the services of a qualified contractor to provide construction services for the replacement of exisiting power feeders from Powerhouse to NIC Building. Hard copies of the bid and drawings are available for sale at a cost of $25 at the DOC Headquarters. Please make an appointment with Keshia Wyllie , if you would like to purchase these document. 

    From: New York City (City)

  • Z2DZ--FY22: NRM Tier 2 (PROJ: 672-22-604) DB Replace Facility Main Feeders at San Juan VAMC

    Type : Pre-Bid Notification

    Due : 21 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 08 Jun, 2022 (23 months ago)

    Replacement of all standby power feeders from paralleling switch gear to all existing substations on the facility. New feeders shall be rated at 15 KV. Drawings are available for D/B Firm to verify route, length, and capacity of the feeder, but it is the responsibility of the D/B Firm to validate the information on them. Work shall be performed without interrupting normal operations of the facility and stand by power capability.

    From: Federal Government (Federal)

  • Power Supply

    Type : Bid Notification

    Due : 24 May, 2024 (in 25 days)
    Posted : 4 days ago
    Started : 24 Apr, 2024 (4 days ago)

    SUBJECT: Synopsis Waiver Exception is taken to this requirement solicitation SPRTA1-24-Q-0187 for PR 24-01130 of the synopsis publicizing IAW with FAR 5.202(a)(13), exception: (i)Is for an amount not expected to exceed the simplified acquisition threshold. (ii)Will be made through a means that provides access to the notice of proposedcontract action through the GPE. (iii)Permits the public to respond to the solicitation electronically. Electronic commerce is defined at 41 USC sec. 426 as electronic techniques for accomplishing business transactions, including electronic mail. Thus, provided the complete solicitation package is available through the GPE and offerors are permitted to respond electronically (i.e., email in this case), the prop...

    From: Federal Government (Federal)

  • Mel Price Lock & Dam Lift Gate Install & Machinery Replacement

    Type : Bid Notification

    Due : 25 May, 2023 (11 months ago)
    Posted : 14 months ago
    Started : 25 Apr, 2023 (12 months ago)

    electrical work includes but is not limited to the following:Replacement of low-voltage 480VAC motor control centers (MCC) including removal of existing MCCs, installation of new MCCs, and replacement of various power feeder cables.Replacement of low-voltage 480VAC electric hoist motors, adjustable speed drive (ASD) motor controller enclosures, and various power feeder cables and control devices.Programming, start-up, and testing of ASD motor controller

    From: Federal Government (Federal)

  • Mel Price Lock & Dam Lift Gate Install & Machinery Replacement

    Type : Pre-Bid Notification

    Due : 15 May, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 01 May, 2023 (12 months ago)

    the replacement lift gate leaves.The electrical work includes but is not limited to the following:Replacement of low-voltage 480VAC motor control centers (MCC) including removal of existing MCCs, installation of new MCCs, and replacement of various power feeder cables.Replacement of low-voltage 480VAC electric hoist motors, adjustable speed drive (ASD) motor controller enclosures, and various power feeder cables and control devices.Programming, start-up

    From: Federal Government (Federal)