Type : Bid Notification
Power Feeder Replacement, Bear Creek Dam, Colorado.
Power Feeder Replacement, Bear Creek Dam, Colorado.
LSD Underground Feeder and Fiber Replacement Agency: Power Authority of New York Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Professional Services Issue Date:09/01/2023 Due Date: 09/29/2023 Ad Type:General
The NYC Department of Correction (DOC) is seeking the services of a qualified contractor to provide construction services for the replacement of exisiting power feeders from Powerhouse to NIC Building. Hard copies of the bid and drawings are available for sale at a cost of $25 at the DOC Headquarters. Please make an appointment with Keshia Wyllie , if you would like to purchase these document.
Replacement of all standby power feeders from paralleling switch gear to all existing substations on the facility. New feeders shall be rated at 15 KV. Drawings are available for D/B Firm to verify route, length, and capacity of the feeder, but it is the responsibility of the D/B Firm to validate the information on them. Work shall be performed without interrupting normal operations of the facility and stand by power capability.
SUBJECT: Synopsis Waiver Exception is taken to this requirement solicitation SPRTA1-24-Q-0187 for PR 24-01130 of the synopsis publicizing IAW with FAR 5.202(a)(13), exception: (i)Is for an amount not expected to exceed the simplified acquisition threshold. (ii)Will be made through a means that provides access to the notice of proposedcontract action through the GPE. (iii)Permits the public to respond to the solicitation electronically. Electronic commerce is defined at 41 USC sec. 426 as electronic techniques for accomplishing business transactions, including electronic mail. Thus, provided the complete solicitation package is available through the GPE and offerors are permitted to respond electronically (i.e., email in this case), the prop...
electrical work includes but is not limited to the following:Replacement of low-voltage 480VAC motor control centers (MCC) including removal of existing MCCs, installation of new MCCs, and replacement of various power feeder cables.Replacement of low-voltage 480VAC electric hoist motors, adjustable speed drive (ASD) motor controller enclosures, and various power feeder cables and control devices.Programming, start-up, and testing of ASD motor controller
the replacement lift gate leaves.The electrical work includes but is not limited to the following:Replacement of low-voltage 480VAC motor control centers (MCC) including removal of existing MCCs, installation of new MCCs, and replacement of various power feeder cables.Replacement of low-voltage 480VAC electric hoist motors, adjustable speed drive (ASD) motor controller enclosures, and various power feeder cables and control devices.Programming, start-up