Search results for: pre-treatment and fats

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • Water Pollution Control Industrial Pre-treatment and Fats, Oil, Grease (FOG) Software System

    Type : Bid Notification

    Due : 30 Mar, 2023 (13 months ago)
    Posted : 15 months ago
    Started : 13 Jan, 2023 (15 months ago)

    R34147 Water Pollution Control Industrial Pre-treatment and Fats, Oil, Grease (FOG) Software System Abstract: This project requires the awardee(s) to provide all labor, materials, equipment, tools, permits, supervision and transportation necessary to Water Pollution Control Industrial Pre-treatment and Fats, Oil, Grease (FOG) Software System in accordance with the scope of services/work, terms and conditions specified in the solicitation.

    From: Wyandotte County (County)

  • Analyses of Samples from the Waste Water Treatment Plant

    Type : Bid Notification

    Due : 25 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Oct, 2021 (about 2 years ago)

    IFB is to establish a contract with one certified laboratory to analyze or test influent and effluent samples on a frequent and regular basis for the Town’s Wastewater Treatment Facility (WWTF) at 2557 Crab Creek Road near Christiansburg, VA.

    From: Virginia ()

  • Mannheim Water Treatment Plant Chlorine Gas System Upgrades, Mannheim Water Treatment Plant, Kitchener, Ontario

    Type : Bid Notification

    Due : 11 Apr, 2024 (17 days ago)
    Posted : 1 month ago
    Started : 07 Mar, 2024 (1 month ago)

    feed system with the addition of a fourth feed line. - Live tap an existing service water line and connect to the chlorine injector system. - Staged replacement of the existing chlorine gas and staged renewal of the solution lines throughout the process area of the plant. - Handle and dispose of existing chlorine gas lines in such a way that prevents chlorine gas release through the plant. - Install a new chlorine solution-based drip system to the pre-treatment

    From: Waterloo (County)

  • Automated Hydrothermal Hydrolysis System

    Type : Bid Notification

    Due : 17 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 04 Oct, 2023 (6 months ago)

    Ten years ago, ACRD purchased a Soxhlet automated extraction unit that lacks a convenient, self-contained, and chemical-safe acid-hydrolysis pre-treatment system. This resulted in heavy use of other methods to measure crude lipids that routinely underestimate actual crude lipid contents.

    From: Canada (Federal)

  • Water Pollution Control Supervisor (40 Hour)

    Type : Bid Notification

    Due : 11 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 19 Feb, 2020 (about 4 years ago)

    Water Pollution Control Laboratory Courses and/or Certification. 3. Demonstrated experience working with a Computerized Maintenance Management System such as AiM or HACH WIMS. 4. A current State of Connecticut P-1 or P-2 license. 5. Licenses or certifications that are relevant to the wastewater field of work as determined by management. 6. Advanced technical writing abilities and mathematical skills. 7.

    From: Connecticut (State)

  • Neuse River Resource Recovery Facility Bioenergy Recovery Project (RFQ)

    Type : Bid Notification

    Due : 24 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 25 Jan, 2022 (about 2 years ago)

    The Project or Work consists of the construction of new and modified wastewater treatment facilities including solids screening, pre-dewatering facilities, thermal hydrolysis process and feed systems, anaerobic digesters, digester gas treatment systems, process steam systems, fats, oils, and grease receiving, and other related treatment plant facilities and upgrades.

    From: Raleigh (City)

  • 81--SHIPPING AND STORAG

    Type : Bid Notification

    Due : 27 Jan, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 12 Jan, 2021 (about 3 years ago)

    SCOPE When discrepancies exist between these requirements and those on current Manufacturer's drawings, contact the contracting officer listed on page 1 block 5 of the contract. 1.1 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers.

    From: Federal Government (Federal)