PREFABRICATED BRIDGE Purchaser : Mary Huffman Organization : Maryland Department of Natural Resources Department : K0000 - DEPARTMENT OF NATURAL RESOURCES Type Code : IT - Invitation to Bid (ITB) Alternate Id : K00R9400220 Info Contact : Mary Huffman 410-260-8056 Pre Bid Conference : N/A
ADVERTISEMENT INFORMATION General Information Department for this solicitation: Procurement Date Prepared: 06/01/18 Types: IFB Advertisement Type: ServiceMaterialsService & MaterialsPW ConstructionAgency ConstructionReal Estate Solicitation/Project#: 6100045984 Solicitation/Project Title: Polymer Prefabricated Bridge Structure Description: The Department
Prefabricated Pedestrian Bridge Replacement for Harris County Precinct 1 - UPIN 19104M23F502 Important Events:OngoingOpen DateOnline PortalPosting date for the OpportunityJan 13th 2023, 11:00 AM CSTN/AUpcomingClose DateOnline PortalDeadline for SubmissionsFeb 13th 2023, 2:00 PM CSTN/APassedPre-Bid ConferenceMicrosoft TeamsA teleconference for this pre-bid conference will be held January 24, 2023, 9:00 a.m.
Product Service Code:- 5420 - BRIDGES, FIXED AND FLOATING NAICS Code:- 332312 - Fabricated Structural Metal Manufacturing Primary point of contact:- Secondary point of contact:-
This is to ensure enough time is available for delivery of the item.BRIEF DESCRIPTION OF PROJECT:The purpose of this project is to:Purchase, and deliver a new 35’ prefabricated steel bridge.The bridge will be;35’ minimum length measured from end of girder to end of girder.14’ minimum width measured from inside of curb to inside of curb.Designed for HL-93 loading.delivered in two longitudinal segments.have convenient lifting points on both segments.be
Added: Mar 19, 2018 11:41 am Prefabricated Bridge Superstructure, Design, Fabrication and Delivery (includes railing and timber wearing surfact) for the Fremont River Ranger District in Sevier County, Utah on the Fishlake National Forest. (Does NOT include installation)
West Canmore Park Bridge Project Description :The Town of Canmore is issuing this Request for Quotation (RFQ) to select a prefabricated bridge supplier for the design, fabrication, supply, delivery, site assembly and installation oversight of a prefabricated, 30 meter long pedestrian bridge for the West Bow River Pathway.
24' by 35' Prefabricated Steel Bridge with Guardrails 24' by 35' Prefabricated Steel Bridge with Guardrails Open 1/13/2020 12:00 AM MST Close 2/10/2020 5:00 PM MST Type RFQ Number RFQ20200320 Contact Mark McClaine mark.mcclaine@idfg.idaho.gov Details View as PDF