Search results for: preliminary environmental

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 938
  • Butterfield Overland Trail Preliminary Environmental and Engineering Services

    Type : Bid Notification

    Due : 13 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Nov, 2021 (about 2 years ago)

    In addition, the DISTRICT is seeking Preliminary Engineering Design to be used for subsequent Design/Build Contract once all environmental work has been completed.

    From: County of Riverside (County)

  • REQUEST FOR PROPOSALS: DESIGN ENGINEERING AND PRELIMINARY ENVIRONMENTAL CONSULTING SERVICES FOR BRANDT ROAD BRIDGE REPLACEMENT PROJECT AT ALAMO RI...

    Type : Bid Notification

    Due : 08 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 24 Jan, 2024 (3 months ago)

    Back to Projects Out to BidREQUEST FOR PROPOSALS: DESIGN ENGINEERING AND PRELIMINARY ENVIRONMENTAL CONSULTING SERVICES FOR BRANDT ROAD BRIDGE REPLACEMENT PROJECT AT ALAMO RIVER IN IMPERIAL COUNTY; BRIDGE NO. 58C-0165; COUNTY PROJECT NO. 7094BRF Plans, specifications, and proposal forms for bidding this project can be obtained at the office of the Imperial County Department of Public Works; 155 South 11th Street, El Centro, CA 92243.

    From: California Department of Public Works (State)

  • FWE-HAZMAT-19

    Type : Bid Notification

    Due : 02 Dec, 2026 (in about 2 years)
    Posted : about 5 years ago
    Started : 29 Nov, 2018 (about 5 years ago)

    Preliminary environmental site examinations, hazardous materials screening services, and/or hazardous materials remediation services for land acquisitions, exchanges, and dispositions.

    From: Massachusetts (State)

  • Dinuba Entertainment Plaza Renovation & Beautification Project

    Type : Bid Notification

    Due : 08 May, 2024 (in 13 days)
    Posted : 13 hours ago
    Started : 09 Apr, 2024 (15 days ago)

    . • Environmental Studies and Documentation – Complete the environmental review; including submitting the Caltrans Preliminary Environmental Study and preparing any required technical studies to complete the CEQA and/or NEPA documents, as required. • Utility Coordination – Submit improvement plans to utility companies in accordance with their requirements.

    From: Tulare (County)

  • Traffic Signal Installation

    Type : Bid Notification

    Due : 10 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 14 Apr, 2022 (about 2 years ago)

    Environmental Site Assessment Reports Addendum Apr 29, 2022 Complete Addendum 2 - Traffic Signal Installation Addendum Apr 29, 2022 Complete Addendum 2 - Preliminary Environmental Site Assessment Reports Addendum Apr 29, 2022 Complete Addendum 2 - Preliminary Environmental Site Assessment Reports Addendum Apr 29, 2022 Complete Addendum 1 - Traffic Signal Installation Addendum Apr 22, 2022 Complete BLR 12326 - Affidavit of Illinois Business Office

    From: Village of Oswego (Village)

  • Big Walnut Trail - Refugee Road to East Main Street

    Type : Bid Notification

    Due : 08 May, 2024 (in 13 days)
    Posted : 6 days ago
    Started : 17 Apr, 2024 (7 days ago)

    Responding consultant teams shall be capable of demonstrating excellence in public engagement, NEPA-level environmental assessments, civil engineering, and sustainable, cost-effective design and project delivery. It is the intent of CRPD that this project design will be developed as a two stage contract. Stage One of the contract will complete preliminary engineering, environmental studies, and community outreach.

    From: City of Columbus (City)

  • Notice of Public Open House Parks Highway Milepost 99-163 Drainage & Culvert Improvements State/Federal Project No. CFHWY00592/ 0A41042

    Type : Bid Notification

    Due : 03 May, 2024 (in 8 days)
    Posted : 11 months ago
    Started : 03 May, 2023 (11 months ago)

    Preliminary engineering and environmental evaluation activities began in summer 2021 and will continue through 2025. The project is being developed in phases:Phase 1: Replace 10 culverts in critical condition that pose the highest risk to highway infrastructure if they fail.

    From: Alaska (State)