Search results for: preserve bridge restoration

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 32
  • Hidden Lake Forest Preserve Bridge Restoration and Reconstruction

    Type : Bid Notification

    Due : 18 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Jan, 2022 (about 2 years ago)

    Scope of Work The work to be done for this project, shown on the Drawings entitled, “Hidden Lake Forest Preserve Bridge Restoration and Reconstruction,” prepared by H.W. Lochner, INC. dated January 17, 2022, consists of removing and disposing of two exis ......

    From: Forest Preserve District (Utilities)

  • Bridge Maintenance & Repair

    Type : Bid Notification

    Due : 16 May, 2024 (in 11 days)
    Posted : 16 days ago
    Started : 03 Apr, 2024 (1 month ago)

    P24-3551-M2A Bridge Maintenance & Repair 05/16/2024

    From: Massachusetts Department of Conservation and Recreation (State)

  • Municipal Bridge Repairs

    Type : Bid Notification

    Due : 10 May, 2024 (in 5 days)
    Posted : 3 days ago
    Started : 16 Apr, 2024 (18 days ago)

    The work generally consists of supplying all materials, labour and equipment necessary to perform miscellaneous repairs to various bridges within the municipality. Bid Document Access : - Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration.

    From: Sault Ste. Marie (City)

  • BRIDGE SCOUR RETROFIT & BRIDGE REHABILITATION

    Type : Bid Notification

    Due : 14 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 13 May, 2023 (11 months ago)

    The proposed project is located in Mohave County on US 93 at MP 127.70 and MP 128.70 approximately 4 miles South of Wikieup. The work consists of scour protections, deck mill and overlay with polyester polymer concrete, construct pavement markings, and other related work.

    From: Arizona Department of Transportation (State)

  • Statewide Bridge Rehabiltiation FY23-24

    Type : Bid Notification

    Due : 30 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 08 Aug, 2023 (9 months ago)

    See more details...

    From: Ohio Facilities Construction Commission (State)

  • Removal of damaged bridge and placement of temporary bridge

    Type : Bid Notification

    Due : 23 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 09 Aug, 2023 (8 months ago)

    The bridge install at Fisher Folly Drive will be a fifty-foot single lane bridge, this will require 2 full size tractor trailer loads, or if using a smaller trailer 3-4 loads. The bridge will require waste blocks abutments to sit on, this will require 4 waste blocks. The bridge will require an unpaved approach on each end, the length of the approach will be roughly 30 feet to transition up to top of the temporary bridge deck.

    From: Vermont (State)

  • Construction Services for Replacement of Mystery Creek Bridge

    Type : Bid Notification

    Due : 06 Jul, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 12 Jun, 2023 (10 months ago)

    Project Description :

    From: MerX (Federal)