REMANUFACTURE/RE-CORE OF THE C-5 PRIMARY AND SECONDARY HEAT EXCHANGER Solicitation ID/Procurement Identifier: FA811820R0016 Ultimate Completion Date: Sun Feb 22 18:00:00 GMT 2026
REMANUFACTURE/RE-CORE OF THE C-5 PRIMARY AND SECONDARY HEAT EXCHANGER Solicitation ID/Procurement Identifier: FA811820R0016 Ultimate Completion Date: Sun Feb 22 18:00:00 GMT 2026
Install new primary heat exchanger, existing secondary heat exchanger, new upper and lower primary heat exchanger plenums, new upper and lower secondary heat exchanger plenums, and new connecting spool piece. E-Bidding No Legal Ad Please select either the View or Edit button to manage legal ad.
Method Download and Mail Distributed By DemandStar Distribution Notes None Scope of Work Remove existing primary and secondary heat exchangers, upper and lower primary heat exchanger plenums, upper and lower secondary heat exchanger plenums, and connecting spool piece.
Removal and replacement of existing primary and secondary heat exchangers on two Carrier LP furnaces (furnace model 58MCB100-20, product number 58MCB100- 11120, series 110).
of 150lb/h using primary reactivation heat only Secondary reactivation heat must be supplied by an electric resistance heater Unit must have a minimum nominal moisture removal rate of 200lb/h using secondary reactivation heat only Unit must have control dampers to dynamically mix up to 100% outdoor air or up to 100% return air Unit must supply 14,000CFM at minimum external static pressure of 1 in-wg Unit weight must not exceed 12,000lb Official Contact
of 150lb/h using primary reactivation heat only Secondary reactivation heat must be supplied by an electric resistance heater Unit must have a minimum nominal moisture removal rate of 200lb/h using secondary reactivation heat only Unit must have control dampers to dynamically mix up to 100% outdoor air or up to 100% return air Unit must supply 14,000CFM at minimum external static pressure of 1 in-wg Unit weight must not exceed 12,000lb Contract duration
This includes but is not limited to:Replacement of secondary clarifier mechanismReplacement of two heat exchangersInstallation of a hydraulic mixing system within Digester 2Replacement of the existing steel floating on Digester 2 with a fixed glass-fused to steel coverStructural rehabilitation of the Detritor, Digester 2, and Secondary Clarifier 3Replacement of Digester Complex roofElectrical, instrumentation and controls upgrades associated with