Type : Contract
NOTICE TO PROCEED REPLACE SUBSTATION SS-6 AT LSA, ISA AIR BASE, BAHRAIN Solicitation ID/Procurement Identifier: N3319120R4003 Ultimate Completion Date: Sat Apr 08 17:00:00 GMT 2023
NOTICE TO PROCEED REPLACE SUBSTATION SS-6 AT LSA, ISA AIR BASE, BAHRAIN Solicitation ID/Procurement Identifier: N3319120R4003 Ultimate Completion Date: Sat Apr 08 17:00:00 GMT 2023
Notice to Proceed Requirements: Remove (including disposal) 9 HVAC units and replace with 8 new units. The 9th unit is a decommissioned unit that does not need replaced. Currently there are four 4-ton units, three 3-ton units, and one 5-ton unit in use. This bid requires a load calculation to be completed prior to installation. Provide applicable information on HVAC units that you recommend. Provide warranty information.
Back to List State of Iowa Bid Opportunities Bid Information Bid Number RFB FY24 #103 Solicitation Replace Solicitation Type Request for Bids County Description Description Replace roof at the Coralville maintenance garage Agency Information Number 645 Name Transportation Address 1 800 LINCOLN WAY Address 2 City/State/Zip Ames, IA 50010 Contact Information Contact Name Teri Schulz Contact Title Purchasing Agent Contact Email
When defects or faulty material is discovered during the guarantee period, the vendor shall, immediately, upon notification by the County, proceed at his/her own expense, to repair or replace the same, together with any damage to all finishes, equipment, and furnishings that may have been damaged as a result of the defective equipment or workmanship. 24.
Work must be completed within 270 calendar days from the notice to proceed. Justification of Work: This project is designed to replace the existing fire alarm system that is outdated, and replacement parts can no longer be purchased in Fort Wayne, VA.
JOE\nCDBG-DR WASTEWATER REHABILITATION PROJECT\nPHASE 1\nCCTV SEWER VIDEO INSPECTION SERVICES\n\nPlease REMOVE the Notice to Proceed in its entirety and REPLACE with revised\nNotice to Proceed attached herein (Attachment D of this Addendum).\n\n11. Will night work be allowed for this project?\n\nCity\u2019s Response to Request for Information Question No. 11\n\nThe City does not anticipate the need for nightwork on this project.
to repair or replace the faulty item at no cost to the University.