Search results for: production lot testing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10,404
  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (in 1 day)
    Posted : 27 days ago
    Started : 03 Apr, 2024 (28 days ago)

    random from the production lot(s) produced.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (in 1 day)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (5 days ago)

    MILITARY PROPERTY AVIATION LIFE SUPPORT PLT SAMPLES PRODUCTION LOT SAMPLE TESTING REQUIRED, GOVERNMENT TESTING. THE PRODUCTION LOT SAMPLE QUANTITY SHALL BE IN ACCORDANCE WITH ANSI/ASQC Z1.4-2008, LEVEL S-2, Table II-A, SINGLE SAMPLING PLANS FOR NORMAL INSPECTION, NO AQL WILL BE USED (per Engineering Support Activity, ESA). SELECTED AT RANDOM BY THE COGNIZANT GOVERNMENT REPRESENTATIVE. FOLLOW E04 FOR SHIPPING INSTRUCTIONS.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (in 1 day)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (5 days ago)

    DAYS):0402 THIS LINE ITEM SIGNIFIES THE PRODUCTION LOT TEST REQUIREMENT (PLT).

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 02 May, 2024 (Tomorrow)
    Posted : 6 days ago
    Started : 25 Apr, 2024 (6 days ago)

    SAMPLES MAY BE CONSIDERED AS PART OF DELIVERABLE PRODUCTION QUANTITY. F.A.T. SAMPLES WILL BE DELIVERED TO NADEP CHERRY POINT. CHERRY POINT'S DODAAC IS N65923 CONTRACTOR SHALL REFER TO COMPLETE F.A.T. INSTRUCTIONS LISTED AS PART OF THE TECH DATA PACKAGE TITLED: 011694445-06172(>,)> ***PRODUCTION LOT TESTING (GOVERNMENT PRODUCT LOT TESTING) REQUIRED. SAMPLE SIZE: 2 EA. FROM FIRST PRODUCTION LOT AND 1 EA. FROM EACH SUCCESSIVE PRODUCTION LOT.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (in 1 day)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (5 days ago)

    IN ADDITION TO ABOVE: -CONTRACTOR PRODUCTION LOT TESTING REQUIRED- -DD1423 CONTRACT DATA REQUIREMENTS /DD 1423 APPLIES- The PLT sample size shall be ( 2 ) for initial production lot and successive lots. A written PLT report shall be forwarded to the PCO in accordance with DD1423 requirements.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (in 1 day)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (5 days ago)

    EA 1.000 NSN/MATERIAL:S00000061 DELIVERY (IN DAYS):0379 THIS LINE ITEM SIGNIFIES THE PRODUCTION LOT TEST REQUIREMENT (PLT).

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 06 May, 2024 (in 4 days)
    Posted : 2 days ago
    Started : 29 Apr, 2024 (2 days ago)

    EA 1.000 NSN/MATERIAL:S00000061 DELIVERY (IN DAYS):0500 THIS LINE ITEM SIGNIFIES THE PRODUCTION LOT TEST REQUIREMENT (PLT).

    From: Federal Government (Federal)