Search results for: proportion system

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 29
  • Custodial Chemical Proportion System, Chemicals & Supplies for the City of Buffalo, Agencies & Auth.

    Type : Bid Notification

    Due : 09 Jun, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 26 May, 2022 (23 months ago)

    Title: Custodial Chemical Proportion System, Chemicals & Supplies for the City of Buffalo, Agencies & Auth. Category: City of Buffalo Bids & RFPs Published Date: 5/26/2022 12:00 PM Due Date: 6/9/2022 11:00 AM

    From: Buffalo (City)

  • Quality Rating System Measure Set with Pharmacy Quality Alliance

    Type : Bid Notification

    Due : 18 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 04 Aug, 2023 (9 months ago)

    Proportion of Days Covered (PDC) Measures – inclusive of three distinct therapeutic areas: (1) Blood pressure (renin angiotensin system antagonists RASA), (2) Diabetes (non-insulin medications), (3) Cholesterol (statins). Under the authority of FAR 6.301-1 10 U.S.C. 2304, Only One Responsible Source and No Other Supplies and Services Will Satisfy Agency Requirements. A justification and approval is currently being processed for this requirement.

    From: Federal Government (Federal)

  • PQA Quality Rating System Measurement

    Type : Bid Notification

    Due : 27 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 13 Jul, 2018 (about 5 years ago)

    Proportion of Days Covered (PDC) Measures - inclusive of three distinct therapeutic areas: (1) Blood pressure (renin angiotensin system antagonists RASA), (2) Diabetes (non-insulin medications), (3) Cholesterol (statins).Under the authority of FAR 6.301-1 10 U.S.C. 2304, Only One Responsible Source and No Other Supplies and Services Will Satisfy Agency Requirements. A justification and approval is currently being processed for this requirement.

    From: Federal Government (Federal)

  • RFP Service Engagement w/ Incarcerated Individuals

    Type : Bid Notification

    Due : 21 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 15 Mar, 2023 (13 months ago)

    A significant proportion of individuals in the criminal justice system have mental health and substance use issues, as well as challenges accessing stable housing. OVERVIEW: These incarcerated individuals often continue to cycle through the legal system, with increasing severity of charges.

    From: Sonoma (County)

  • Gantry Robotic Ceramic Peening System

    Type : Bid Notification

    Due : 17 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Dec, 2021 (about 2 years ago)

    Proportion Air Regulator Systems: Brand Name Only; NO SUBSTITUTIONS. 2. EI Magna Valves and Flow Controllers: Brand Name Only; NO SUBSTITUTIONS.  3. Goodyear Plicord 4-Ply Pressure Blast Hose: Brand Name or Equal.  4. SWECO Screens: Brand Name Only; NO SUBSTITUTIONS. 5. Fanuc 31i CNC Controller and Fanuc Motors: Brand Name only; NO SUBSTITUTIONS. 6. Gantry Robot: Fanuc Servo Drives/Amplifiers for all axes.

    From: Federal Government (Federal)

  • 68--Chlorine-Dioxide system

    Type : Bid Notification

    Due : 12 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 05 Sep, 2018 (about 5 years ago)

    The chlorine dioxide generation system shall have the capacity (at 2.5 pounds per day) to treat a peak flow rate of 140 gallons per minute up to 0.7 ppm of chlorine dioxide residual. The generator will produce a 2000 ppm solution of chlorine dioxide which will inject into the respective cold and hot water systems. The chlorine dioxide will be applied in proportion to the water system flow rate.

    From: Federal Government (Federal)

  • 68--Chlorine-Dioxide system

    Type : Bid Notification

    Due : 24 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 18 Sep, 2018 (about 5 years ago)

    The chlorine dioxide generation system shall have the capacity (at 2.5 pounds per day) to treat a peak flow rate of 140 gallons per minute up to 0.7 ppm of chlorine dioxide residual. The generator will produce a 2000 ppm solution of chlorine dioxide which will inject into the respective cold and hot water systems. The chlorine dioxide will be applied in proportion to the water system flow rate.

    From: Federal Government (Federal)