Type : Bid Notification
2024 24-135 FIRE PROTECTION SYSTEM MAINTENANCE Bidders Public 05/16/2024 2:00 PM
People also searched for
2024 24-135 FIRE PROTECTION SYSTEM MAINTENANCE Bidders Public 05/16/2024 2:00 PM
Sealed Solicitation Building Access Control, Security Cameras, and Fire Protection System Open 2024-074R 5/23/2024 2:00 PM 5/16/2024 8:15 AM 2
MPHEN11086GX Briefing Meeting: 2024-04-23 10:00 Tender Closing Date: 2024-05-08 10:00 Required At: Eskom Holdings SOC Limited Gauteng Details :- Tender Notice and Invitation to Tender DESIGN, MANUFACTURE, SUPPLY, INSTALL, AND COMMISSIONING OF FIRE PROTECTION SYSTEM (UPGRADE TO ADDRESS WORSE CASE SCENARIO) AT HENDRINA POWER STATION FOR A PERIOD OF THREE YEARS.
By optimizing this material for the fire environment, utilizing heat shield test methods, and experimenting with different materials, the NASA team developed a multilayered fire protection system.
The National Park Service (NPS) has a requirement for Inspection, Testing, and Maintenance (ITM) of 16 fire sprinkler systems and their components at Lassen Volcanic National Park (LAVO) located in Tehama and Shasta Counties, California.
Contractor shall provide all material, transportation, labor, equipment, coordination, planning, and supervision necessary to purchase and install permanent type roof fall protection system on buildings identified by Anniston Army Depot (ANAD). Questions concerning this solicitation shall be submitted by close of business on 22 April 2024 (three working days after the scheduled site visit). Please submit all questions to the contract specialist.
This work includesdemolishing alarm devices for the existing high expansion foam system, abandon remaining components of the system in place. The existing wet sprinkler system will remain. It alsoincludes upgrading the alarm system with a combined mass notification and fire alarm system plus installing a new electrical panel and mini-split system in the alarm room to meetcurrent fire code.