Search results for: pump and blower building

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 113
  • Pump and Blower Building Roof Replacement

    Type : Bid Notification

    Due : 01 Mar, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 01 Feb, 2023 (15 months ago)

    Project Title Pump and Blower Building Roof Replacement Invitation # DP 7370 Bid Posting Date 02/01/2023 11:35 AM (PST) Project Stage Bidding Bid Due Date 03/01/2023 2:00 PM (PST) Response Format Paper Project Type Bid Response Types Line Items Type of Award Lump Sum Categories 77000 - Roofing Materials And Supplies 91066 - Roofing, Gutters, And Downspouts Maintenance And Repair 91200 - Construction Services, General (Incl.

    From: Central San (County)

  • IFB 2024-003 Twelve Mile Creek WRF 9.0 MGD Expansion

    Type : Bid Notification

    Due : 01 Nov, 2023 (5 months ago)
    Posted : 7 months ago
    Started : 19 Sep, 2023 (7 months ago)

    of manual bar racks and level sensor in Grit Removal Facility; new Blower 4 at the Blower Building; MLSS Distribution Structure improvements; condition repairs of Clarifiers 1-2 and RAS Pump Station A; new Clarifier 4 and RAS Pump Station B; condition repairs of Clarifiers 5-6 and RAS Pump Station C; channel covers provided at UV Facility; new NPW surge tank; new standby fan for Odor Control – Solids; new Chemical Facility with two storage tanks,

    From: North Carolina Electronic (Other)

  • MAILBOX ONLY Request for Qualifications (RFQ) for Fresno-Clovis Regional Wastewater Reclamation Facility Duct Bank at Primary Sludge Pump Station #1

    Type : Bid Notification

    Due : 01 Sep, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 28 Jul, 2023 (9 months ago)

    And Hydraulic) 72000 - Pumping Equipment And Accessories 78555 - Engineering And Technical Instruction Equipment And Materials (For Air Conditioning, Electronics, Machine Shop, Etc.) 89000 - Water Supply, Groundwater, Sewage Treatment, And Related Equipment (Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water) 90600 - Architectural Services, Professional 90607 - Architect Services, Professional 90629 - Environmental - Architectural

    From: Fresno (City)

  • ITB 6698 Brush Creek WWTP Building Renovations

    Type : Bid Notification

    Due : 21 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    Title: ITB 6698 Brush Creek WWTP Building Renovations Deadline: 6/21/2023 2:00 PM (UTC-05:00) Eastern Time (US & Canada) Status: Open Solicitation Number: ITB 6698 Description: Brush Creek WWTP Pump and Blower building renovations Pre-Bid Meeting Date: 5/31/2023 2:00 PM Pre-Bid Meeting Details: optional Documents: Documents as of 5/18/2023 ITB 6698 Brush Creek WWTP Renovations-project announcement.pdf All Additions Addition 1 Posted: 6/2/2023 Type

    From: Johnson (City)

  • Wastewater Roof Improvements

    Type : Bid Notification

    Due : 30 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 16 Aug, 2023 (8 months ago)

    Miscellaneous repairs will be completed on the Influent Pump Station, Grit Dewatering Building, Blower Building, and Sludge Pump Building located at the Wastewater Treatment Facility, 4366 Napoleon Street SE, Iowa City Iowa 52246 and South McCollister Pump Station, 396 McCollister Boulevard, Iowa City, Iowa Project Schedule Information: Substantial Completion: December 22, 2023 Final Completion: January 22, 2024 Liquidated Damages: $240 per day Engineer's

    From: Iowa City (City)

  • Water Pollution Control Facility (WPCF) Improvements - Phase II Construction Management Services

    Type : Bid Notification

    Due : 19 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 08 Nov, 2023 (5 months ago)

    serving existing plant loads including the primary clarifiers, vacuators, digesters, site waste pump station, existing administration building, boiler building, warehouse, air compressor building, West Trickling Filter, and miscellaneous other site loads.

    From: Hayward (City)

  • Wastewater System Improvements, Thompson Falls

    Type : Bid Notification

    Due : 10 Nov, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 26 Oct, 2020 (about 3 years ago)

    The project also includes rehabilitating the existing treatment system lagoons by construction of a headworks building, screen system, complete mix / partial mix covered lagoon system utilizing existing lined lagoons, polishing reactor, disinfection building, blower building updates, blowers and aeration system, ultraviolet disinfection system, system piping, sludge removal and disposal and other related site improvements and demolition.

    From: Washington State Office of Minority and Women (State)