Type : Bid Notification
The Contractor shall coordinate efforts with the Township to notify affected residents during construction.ADD/ALTERNATE BID: In general, the work on this project consists of installing an emergency standby bypass pumping system for the Haddontowne pump station located in Cherry Hill. The bypass pump shall be installed on a new concrete pad located within the boundaries of the site.