Search results for: pump station flow meter

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 107
  • Calafia Pump Station Flow Meter and Vault Replacement

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 14 Nov, 2022 (17 months ago)

    Project Title Calafia Pump Station Flow Meter and Vault Replacement Invitation # 24401 Bid Posting Date 11/14/2022 1:52 PM (PST) Project Stage Bidding Bid Due Date 12/01/2022 2:00 PM (PST) Response Format Electronic Project Type Bid Response Types Line Items Completed Section 00400 through 00460 (required) Type of Award Lump Sum Categories 91300 - Construction Services, Heavy (Incl.

    From: San Clemente (City)

  • FLOW METER CALIBRATION (230040-002)

    Type : Bid Notification

    Due : 31 Dec, 2024 (in 8 months)
    Posted : 7 days ago
    Started : 04 Apr, 2024 (22 days ago)

    Rogers Road Pump Station -- flow meter, Thermo Fischer SX50 5MGD 46. Rogers Road Pump Station - flow meter & graphic recorder, Flexum 7407 10MG 47. Elma Pump Station - flow meter & graphic recorder, Rosemount 87 12C R12NOM4T 1 48. Blasdell Pump Station -- Ford flow meter, Flo-dar model 4000-930, 0-5 MGD 49. Blasdell Pump Station, Inicepeter flow meter, Flo-dar model 4000-930, 0-10 MGD ADDITIONAL FLOW METERS 50.

    From: Erie (County)

  • Plant Miscellaneous Improvements

    Type : Bid Notification

    Due : 26 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 06 Dec, 2022 (16 months ago)

    . • Replacement of lighting in the Fuel Island canopy. • Repair of concrete curb on top of the Alvarado Influent Pump Station Flow Meter Pit. • Replacement of W4 piping on the south exterior wall of the Centrifuge Building. • Replacement of W4 piping inside the Odor Control Building. • Repair of Surge Tower staircase railing post. • Replacement of one segment of sodium hypochlorite trench and piping. • Replacement of sodium hypochlorite piping feeding

    From: Union Sanitary District (City)

  • RFQ 1923 - Magnetic Flow Meter for City Valley Pump Station

    Type : Bid Notification

    Due : 07 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 25 Sep, 2019 (about 4 years ago)

    Bid Number:RFQ - 1923 Bid Title:RFQ 1923 - Magnetic Flow Meter for City Valley Pump Station Category:City of Midland Bid OpportunitiesStatus:Open Publication Date/Time: 9/25/2019 12:00 AM Closing Date/Time: 10/7/2019 9:00 AM Related Documents: RFQ 1923 - Magnetic Flow Meter for City Valley Pump Station Return To Main Bid Postings Page

    From: Midland (City)

  • South Water Treatment Plant (SWTP) West High Service Pump Station

    Type : Bid Notification

    Due : 11 May, 2023 (11 months ago)
    Posted : 14 months ago
    Started : 28 Feb, 2023 (14 months ago)

    City Self Declaration Certifications Scope of Work The City of Marco Island is soliciting bids to construct a new high service pump station (HSPS) and flow meter pad at the South Water Treatment Plant located at 415 Lily Court, Marco Island, FL 34145.

    From: Marco Island (City)

  • IP Mills Pump Station and Sewer Force Main

    Type : Bid Notification

    Due : 21 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 23 Jun, 2021 (about 2 years ago)

    The work consists of installation of approximately 750 linear feet of high-density polyethylene sewer force main, a precast concrete packaged wastewater pump station including pumps and controls, flow meter and associated valve vault, propane generator and tank, site fencing, connection to the existing gravity sewer system, and surface restoration. Bids shall be on a unit price basis.

    From: Massachusetts (State)

  • RFQ-WASTEWATER HYDRAULIC MODEL DEVELOPMENT UNDER WET WEATHER

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 21 months ago
    Started : 02 Aug, 2022 (21 months ago)

    The calibration of the wet weather model will require flow and rainfall monitoring. A minimum of 25 flow monitors and 6 rainfall gauges will be utilized across the wastewater service area for a period of 3 to 6 months or until significant rainfall events have been captured. Furthermore, existing pump station flow meters, pump run- time, on/off pump data loggers and wastewater treatment plant flows will be used in calibration.

    From: Charlotte Douglas International Airport (Airport)