Search results for: qa testing

Showing opportunity 1 - 10 of 17
  • HIGHWAY SUMMER MAINTENANCE BOOK RECAP (240045-004)

    Type : Bid Notification

    Due : 31 Mar, 2025 (in 11 months)
    Posted : 19 hours ago
    Started : 04 Apr, 2024 (15 days ago)

    Day -- $900.00 $850.00 $850.00 E402.9902 Nuclear Density Testing (Overtime) Hour -- $175.00 $135.00 $135.00 E402.9910 In-Plant Quality Assurance (QA) Testing Day -- $900.00 $850.00 $850.00 E402.9911 In-Plant Quality Assurance (QA) Testing (Overtime) Hour -- $175.00 $135.00 $135.00 2024 Summer Maintenance Bid Page 10 of 123 SECTION 402 Item No.

    From: Erie (County)

  • EMISSIONS TESTING (220272-002)

    Type : Bid Notification

    Due : 31 Dec, 2026 (in about 2 years)
    Posted : 19 hours ago
    Started : 04 Apr, 2024 (15 days ago)

    Quality Assurance Procedures All quality assurance (QA) procedures and results conducted during the compliance testing shall be documented by the stack testing firm and included in the final compliance testing report to be furnished by the stack testing firm.

    From: Erie (County)

  • BEAM,STRUCTURAL

    Type : Bid Notification

    Due : 22 Apr, 2024 (in 2 days)
    Posted : 25 days ago
    Started : 25 Mar, 2024 (25 days ago)

    . 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;Roy Janney NAWCADLKE QA / Tel: (732)-323-2834 E-mail: roy.a.janney.civ@us.navy.mil; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract,

    From: Federal Government (Federal)

  • 4th/5th Streets Improvements– Pilot Phase

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 10 days)
    Posted : 14 days ago
    Started : 22 Mar, 2024 (29 days ago)

    The Date of Final Completion of the Work is the date certified by the Owner when all construction, and all other Work including, but not be limited to: testing, QA/QC, receipt of required reports and/or forms, grant requirements (if applicable), punch list items, clean-up, receipt of drawings and/or as-builts, etc., is fully complete, and in accordance with the Contract Documents. 2.20.

    From: Grand Junction (City)

  • Safe Routes to School – Sidewalk 27 Road

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 9 days)
    Posted : 22 days ago
    Started : 13 Mar, 2024 (1 month ago)

    The Date of Final Completion of the Work is the date certified by the Owner when all construction, and all other Work associated to include, but not be limited to: testing, QA/QC, receipt of required reports and/or forms, grant requirements (if applicable), punch list items, clean-up, receipt of drawings and/or as-builts, etc., is fully complete, and in accordance with the Contract Documents. 2.20.

    From: Grand Junction (City)

  • BGS Graphic Design State Curators Office 2024

    Type : Bid Notification

    Due : 26 Apr, 2024 (in 6 days)
    Posted : 14 days ago
    Started : 22 Mar, 2024 (29 days ago)

    Network Consulting LAN/WAN Support Services $ $ Contractor shall provide consulting services for LAN/WLAN network Services; functional specifications, network design, network management, data conversion, interfaces, integration, network testing/QA, implementation, training, documentation, and maintenance including version control, support, and issue tracking.

    From: Vermont (State)

  • RFP - Retainer Contract Opportunity for Information Technology (IT) Services

    Type : Bid Notification

    Due : 01 May, 2024 (in 11 days)
    Posted : 24 days ago
    Started : 12 Mar, 2024 (1 month ago)

    Network Consulting LAN/WAN Support Services $ $ Contractor shall provide consulting services for LAN/WLAN network Services; functional specifications, network design, network management, data conversion, interfaces, integration, network testing/QA, implementation, training, documentation, and maintenance including version control, support, and issue tracking.

    From: Vermont (State)