Search results for: qualifications and approach

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 21,905
  • Request for Qualifications for Runway 18 Approach Obstruction Removal

    Type : Bid Notification

    Due : 10 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Feb, 2020 (about 4 years ago)

    REQUEST FOR QUALIFICATIONS   Notice is hereby given that the Greater Lafourche Port Commission is requesting Statements of Qualifications from qualified firms for Engineering, Design and Construction Phase Services for Runway 18 Approach Obstruction Removal Project at South Lafourche Leonard Miller, Jr. Airport in Galliano, Louisiana. 

    From: Greater Lafourche Port Commission (Port)

  • Request for Qualifications (“RFQ”) for Professional Engineering Services

    Type : Bid Notification

    Due : 13 May, 2024 (in 13 days)
    Posted : 5 days ago
    Started : 09 Apr, 2024 (20 days ago)

    PROJECT SCOPE The Village will receive and evaluate engineering consultant proposals with statement of qualifications, relevant experience, references, availability, and project approach to perform Phase 1 Engineering, Environmental and Planning services for all work associated with the preparation of preliminary engineering and environmental studies and permits for a new grade separation structure generally connecting Franklin Avenue to Belmont/Pacific

    From: Franklin Park (Village)

  • Daviess Board of Commissioners is seeking LOI’s from Consultants interested in a Bridge Rehabilitation Project. Coping and barrier rail replacement, interior pi...

    Type : Bid Notification

    Due : 15 May, 2024 (in 15 days)
    Posted : 12 days ago
    Started : 02 Apr, 2024 (27 days ago)

    Describe the capacity of consultant staff and their ability to perform the work in a timely manner relative to present workload. 2. Project Approach a. Provide a description of your project approach relative to the advertised services. For project specific items confirm the firm has visited the project site.

    From: Indiana Department of Transportation (Transportation)

  • Construction Manager for Vancouver Aquatic Centre Pre-qualification

    Type : Bid Notification

    Due : 02 May, 2024 (in 2 days)
    Posted : 3 months ago
    Started : 30 Jan, 2024 (3 months ago)

    and relevant experience; and 2) Respondent’s demonstration of sufficient qualified staff to act as back-up in case of unexpected absence of key personnel. 2.2.4 Approach and Methodology: Based on a brief (maximum one page) outline of the Respondent’s approach to the project and to risk, schedule, cost and quality control as applied to the project 2.2.5 Financial Capability: Financial capability to undertake the role of Prime Contractor. 2.2.6 Litigation

    From: Vancouver (City)

  • EPD: Cemetery Brook Drain Tunnel Project. Request for Qualifications - General Contractor.

    Type : Bid Notification

    Due : 06 May, 2024 (in 5 days)
    Posted : 1 month ago
    Started : 06 Mar, 2024 (1 month ago)

    Request for Qualifications – Manchester, New Hampshire DPW Dated: May 15, 2024 Page 39 of 105 Prudent Industry Practice The Contractor shall construct the Project as designed, in a good and workmanlike manner, free from defects, and in accordance with Prudent Industry Practice.

    From: Manchester (City)

  • Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)

    Type : Bid Notification

    Due : 10 May, 2024 (in 10 days)
    Posted : 10 days ago
    Started : 19 Apr, 2024 (10 days ago)

    The Federal Aviation Administration (FAA), has a requirement to replace the Anchorage Airport [I(1] Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON).

    From: Federal Government (Federal)

  • REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK (CMAR)

    Type : Bid Notification

    Due : 31 May, 2024 (in 1 month)
    Posted : 3 days ago
    Started : 26 Apr, 2024 (4 days ago)

    Explain the management tools, techniques and procedures the firm uses to monitor and maintain the construction phase schedule. 7. Describe your approach to the collaboration with the county and the design team relative to project design and materials/systems research that will assure the functional, aesthetic, and quality requirements are satisfactorily addressed for this project. 8.

    From: Halifax (County)