Type : Bid Notification
The work includes, but is not limited to: 1.1 Basic Package: a. Demolish existing underground pipe, manholes, valves, valve boxes, backflow preventers, water meters, fire hydrants, air relief valves and other existing elements and accessories, as indicated in the drawings. Those pipe sections that are no longer part of the potable water distribution system shall be capped. b. Furnish and install underground pipe, valves, valve boxes, “T” connections, backflow preventers, water flow meters, fire hydrants, and related elements and accessories, as indicated in the drawings. c. Paint new barrel type hydrants, including hydrant number. Install bollards around the new b...