Search results for: rail configuration

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 75
  • Rail Configuration Management System

    Type : Bid Notification

    Due : 11 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 11 Aug, 2023 (8 months ago)

    Project Title Rail Configuration Management System Invitation # 802696 Bid Posting Date 08/11/2023 12:25 PM (CDT) Project Stage Bidding Bid Due Date 09/11/2023 3:00 PM (CDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Cost File Response File Exhibit A - Pricing Schedule (Excel, unsigned) (required) Exhibit B - Reps & Certs (PDF, signed) (required) Exhibit C-1 for Vol 1 (if applicable) Exhibit C-1 for Vol 2 (if

    From: Capital Metropolitan Transportation Authority (Transportation)

  • INVITATION TO BID 3077: France Yard Extension New Rail Configuration

    Type : Bid Notification

    Due : 24 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 27 Jan, 2023 (15 months ago)

    INVITATION TO BID 3077: France Yard Extension New Rail Configuration postdate:- 27-Jan-2023 12:00:00 AM responsedate:- 24-Feb-2023 10:00:00 AM ( 17h, 48m+ ) description:- INVITATION TO BID 3077: France Yard Extension New Rail Configuration - Per Specifications Provided

    From: New Orleans Public Belt Railroad (Port)

  • Millennium Park Boardwalk Refurbishment

    Type : Bid Notification

    Due : 10 Nov, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 08 Oct, 2022 (19 months ago)

    Contractor is to take measurements and notes of existing width, post spacing, rail configuration prior to demolition. Once decking is removed, inspection of underlying joists, blocking, and beams shall take place with KCPD to determine the need for replacement or refurbishment. Inspections can be done incrementally with deck replacement. All blocking shall be brought to the standards as shown on the detail.

    From: Kent County Administration (County)

  • 65--Stryker ibeds (Notice of intent to perform oral solicitation)

    Type : Bid Notification

    Due : 06 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 04 Sep, 2018 (about 5 years ago)

    The bed needs to monitor bed fall risk compliance measures including bed low height, brake engagement, side rail configuration and bed exit armed/disarmed. The bed must also monitor the 30-degree head of bed lockout, which is a Ventilator Associated Pneumonia compliance strategy. We also need a local visual display that the bed is in the proper configuration and another visual display when the bed is in the incorrect configuration.

    From: Federal Government (Federal)

  • Guardrail Improvements

    Type : Bid Notification

    Due : 07 May, 2024 (in 3 days)
    Posted : 23 hours ago
    Started : 11 Apr, 2024 (23 days ago)

    Guardrail ImprovementsCOSe24-0026Closing Date: 05/07/2024 02:00:59 PM SK Detail: There will NOT be a public opening – unofficial ITT results will be published to Biddingo after the submission deadline. Please review Part 2 with regards to bid compliancy. Bid Security - Each bid must include bid security in the form of an electronically verifiable digital bid bond - Refer to Appendix B – ITT Particulars (c. Mandatory Submission Requirements) for complete Bid Bond instructions. Summary Notice and Notice of Intended Procurement This Summary Notice and Notice of Intended Procurement is issued by the City of Saskatoon (the “City”) for procurements covered by the Canadian Free Trade Agreement and/or the Comprehensive Economic and Trade Agreement ...

    From: Saskatoon (City)

  • Guardrail Improvements

    Type : Bid Notification

    Due : 07 May, 2024 (in 3 days)
    Posted : 1 day ago
    Started : 11 Apr, 2024 (22 days ago)

    Guardrail ImprovementsCOSe24-0026Closing Date: 05/07/2024 02:00:59 PM SK Detail: There will NOT be a public opening – unofficial ITT results will be published to Biddingo after the submission deadline. Please review Part 2 with regards to bid compliancy. Bid Security - Each bid must include bid security in the form of an electronically verifiable digital bid bond - Refer to Appendix B – ITT Particulars (c. Mandatory Submission Requirements) for complete Bid Bond instructions. Summary Notice and Notice of Intended Procurement This Summary Notice and Notice of Intended Procurement is issued by the City of Saskatoon (the “City”) for procurements covered by the Canadian Free Trade Agreement and/or the Comprehensive Economic and Trade Agreement ...

    From: Saskatoon (City)

  • 6515--Ook Snow Beds

    Type : Bid Notification

    Due : 26 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 13 Jan, 2022 (about 2 years ago)

    These beds will provide a safer environment for Veterans due to the low-rise, side-rail configuration and entrapment requirements. The CLC currently has 165 of these beds currently in use, and continuity and standardization of equipment type is required for this procurement. 2. Scope The contractor shall provide all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified.

    From: Federal Government (Federal)