Search results for: rail hvac overhaul

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 62
  • LIGHT RAIL HVAC OVERHAUL PROJECT

    Type : Bid Notification

    Due : 31 Jan, 2023 (15 months ago)
    Posted : about 2 years ago
    Started : 09 Feb, 2021 (about 3 years ago)

    SummarySanta Clara Valley Transportation Authority (VTA) seeks bids from qualified firms to provide parts for it's Light Rail HVAC Overhaul Project.

    From: Santa Clara Valley Transportation Authority (Transportation)

  • Light Rail HVAC Overhaul Project

    Type : Bid Notification

    Due : 29 Jan, 2023 (15 months ago)
    Posted : 17 months ago
    Started : 14 Jan, 2023 (15 months ago)

    Project Description:VTA's Light Rail Maintenance is preparing to perform a mid-life overhaul on the fleet of 98 Kinkisharyo Light Rail Trains HVAC systems (the "Project"). This Project will ensure that the trains provide safe reliable service to our patrons and fulfill VTA's commitment to protecting the large investment made in these trains. The Project will replace worn parts and will meet the manufacturers recommended overhaul intervals.

    From: Santa Clara Valley (Transportation)

  • Overhaul of HVAC Compressor Motors.

    Type : Contract

    Due : 30 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 01 Mar, 2023 (14 months ago)

    Overhaul of HVAC Compressor Motors. Agency: MTA - NYC Transit (NYCT) Category:Transportation, Bus, Rail, Marine & Aviation - Consulting & Other Services Issue Date:03/01/2023 Due Date: 03/30/2023 Ad Type:General

    From: New York State Contract Reporter (City)

  • FY19 DRYDOCK AND DOCKSIDE REPAIRS TO NOAA SHIP PISCES

    Type : Bid Notification

    Due : 03 Oct, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 15 Oct, 2018 (about 5 years ago)

    OPTION - ADDITIONAL DRYDOCK WORK ITEMS: Speed Log Doppler (Electronics Item); Ship's Temperature Sensor Repair (Electronics Item); EM Speed Log (Electronics Item); Transducer Survey; VSAT Safety Rails Installation; Main Seawater Cooling System Piping Ultrasonic Testing; Thrust Bearing RTD Installation; Deck Tile Replacement; HVAC System Repairs (Habitability).

    From: Federal Government (Federal)

  • Y--KINGS BAY DRY DOCK RECAPITIALIZATION, NAVAL SUBMARINE BASE (SUBASE), KINGS BAY, GEORGIA

    Type : Bid Notification

    Due : 19 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 30 Jan, 2019 (about 5 years ago)

    Work will include (but is not limited to): replacement of cover skin and coating preservation of cover superstructure; repairs and overhaul of crane rails; concrete repairs to dry dock body, flooding and discharge conduits, galley walls, sluice gate vaults; replacement of ship guide rails; overhaul to steel caisson; bridge cranes(2) overhaul; discharge pump piping; super flood piping; various sluice gates replacements; replacement of pumping control

    From: Federal Government (Federal)

  • Z--Explosive Handling Wharf 1 Phases 2 and 3 Repairs at Naval Submarine Base Kings Bay, Georgia

    Type : Bid Notification

    Due : 10 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 08 Aug, 2018 (about 5 years ago)

    Phase 3: Repair and/or replacement of the wall cladding, attachments, coatings and sealants; repair of the ventilation louvers; repairs of the electrical components including electrical conduit, fixtures, and corrosion control of utility covers; repair of the crane rail system including crane rail, hot rail, and truck overhaul; repair of the stairs and handrails; replacement of the HVAC system in the support building; and replacement of the elevator

    From: Federal Government (Federal)

  • RFP - Water Tower Inspection RFP

    Type : Bid Notification

    Due : 23 May, 2024 (in 19 days)
    Posted : 17 months ago
    Started : 07 Apr, 2024 (26 days ago)

    Include price breakdown for each piece of equipment including shipping. Include a picture and list all laptop specifications. Include full make and model for laptops and printers. All equipment should be ruggedized for 24/7 use in a police vehicle and should include mounting equipment. Laptops will not be hard mounted and will be used outside of the vehicle, however, printers will not be removed. RUGGED COMPUTER EQUIPMENT – 4 LAPTOPS Windows 11 Pro Internal GPS Internal Cellular modem, BAND14 compliant through FirstNet/AT&T Internal Bar Code Scanner 14 inch touch screen Backlit keyboard Min 16GB RAM, upgradable to 64GB Min 256GB SSD NVMe preferred, not soldered to the motherboard so I can upgrade or change if needed. 2 USB 3.0 ports HDMI po...

    From: Rockingham (County)