Type : Bid Notification
Repair Rail Line West, 3CDSB Garrison Wainwright, Alberta Project Description :DEFENCE CONSTRUCTION CANADA (DCC) – WR000077_CN78893 – Repair Rail Line West, 3CDSB Garrison Wainwright, Alberta ... See more
Repair Rail Line West, 3CDSB Garrison Wainwright, Alberta Project Description :DEFENCE CONSTRUCTION CANADA (DCC) – WR000077_CN78893 – Repair Rail Line West, 3CDSB Garrison Wainwright, Alberta ... See more
CPKCS operates two tracks, Metra’s Milwaukee District West Line operates two tracks and provides commuter rail stations with access to points West to Elgin and East to downtown Chicago, and the Indiana Harbor Belt (IHB) operates one track.
State:ArizonaCity:PhoenixDelineated AreaNorth: Camelback Rd; East 7th St; South: Union Pacific Rail line; West: 7th AveMinimum Sq Ft. (ABOA):5,726Maximum Sq. Ft. (ABOA):5,726Space Type:OfficeParking Spaces (Total):12Parking Spaces (Surface):0Parking Spaces (Structured):12Parking Spaces (Reserved):6Full Term:5 yearsFirm Term:3 yearsAdditional Requirements:Normal working hours is set at 7:00 am to 4:00 pm.
The Rapid Transit Program Office is currently tasked with the following Rapid Transit (RT) projects, which collectively make up the “Project” namely:Bus Rapid Transit (BRT):Downtown Mobility Hub and Transitway Connection (DMHTC)Dundas BRT EastLakeshore BRTLight Rail Transit (LRT):Hazel McCallion Line (HML)Eglinton Crosstown LRT West Extension (ECWE) - Mississauga jurisdictionFuture Rapid Transit projects Bid Document Access: Bid document preview,
The City will be the location of the West Santa Ana Branch (WSAB) light-rail line’s southern terminus stop, with a station and the line’s only multi-story parking garage to be located prominently in the City’s Downtown.To download the RFP, click here.City Hall is open Monday-Thursday from 7:30 am - 5:00 pm. City Hall is closed every other Friday.
MARTA Headquarters IFB B31586 Track Renovation Phase IV Running Rail, Switch Steel, Tie and Fastener Replacement The work generally consists of furnishing and installing certain track products on the Authority's East, West, North, Northeast, and South Rail Lines, and both Avondale and South Yards; and disposing of replaced track materials.