Search results for: ramp and brick work

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 89
  • This project consists of an exterior accessible ramp and brick work. Some openin...

    Type : Bid Notification

    Due : 07 Sep, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 05 Aug, 2022 (21 months ago)

    Smart Number 8349-20220805093456 ECCC Constru Advertised Date 08/05/2022 12:00 PM RFx # 3170022556 Submission Date 09/07/2022 10:00 AM RFx Status Open Major Procurement Category CONSTRUCTION RFx Opening Date N/A Sub Procurement Category CONSTRUCTION - SERVICES RFx Type MDA - RFx Agency MPTAP RFx Description This project consists of an exterior accessible ramp and brick work.

    From: Mississippi (State)

  • C--526-17-105 Building 16 Alteration

    Type : Bid Notification

    Due : 13 Nov, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 12 Oct, 2017 (about 6 years ago)

    Exterior Demolish existing ramp and railing and create ADA ramp at same location existing ADA ramp is located.ADA ramp to connect to entrance opening of new elevator in front of building or to side entrance of Building if elevator is designed to go inside Bldg. Ramp is to have new rail installed in sleeves filled with epoxy.Rail to match type and color of rail at front main entrance of Bldg. 16.

    From: Federal Government (Federal)

  • RFP24 7573 OQ Summerlin Ave Improvements Project

    Type : Bid Notification

    Due : 25 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Water and sewer main replacements within the Harwood Street Brick Street Project will not include the work within the Summerlin intersection limits, however the work zones will go up to the Summerlin intersection on both sides of Harwood Street.

    From: Manatee County School District (School)

  • RFP24 7573 OQ Summerlin Ave Improvements Project

    Type : Bid Notification

    Due : 25 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Water and sewer main replacements within the Harwood Street Brick Street Project will not include the work within the Summerlin intersection limits, however the work zones will go up to the Summerlin intersection on both sides of Harwood Street.

    From: Cocoa (City)

  • RFP24 7573 OQ Summerlin Ave Improvements Project

    Type : Bid Notification

    Due : 25 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Water and sewer main replacements within the Harwood Street Brick Street Project will not include the work within the Summerlin intersection limits, however the work zones will go up to the Summerlin intersection on both sides of Harwood Street.

    From: Citrus County Board of County Commissioners (County)

  • RFP24 7573 OQ Summerlin Ave Improvements Project

    Type : Bid Notification

    Due : 25 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Water and sewer main replacements within the Harwood Street Brick Street Project will not include the work within the Summerlin intersection limits, however the work zones will go up to the Summerlin intersection on both sides of Harwood Street.

    From: Brevard County Board of County Commissioners (County)

  • RFP24 7573 OQ Summerlin Ave Improvements Project

    Type : Bid Notification

    Due : 25 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Water and sewer main replacements within the Harwood Street Brick Street Project will not include the work within the Summerlin intersection limits, however the work zones will go up to the Summerlin intersection on both sides of Harwood Street.

    From: Valencia College (Higher Education)