Search results for: ramp and new dock

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 132
  • Mt. Baker/Snoqualmie National Forest Boat Dock and Ramp purchase and Installation

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 21 days ago
    Started : 22 Apr, 2024 (3 days ago)

    Dock and Ramp must be in safe working order when installation is completeDock secured with 4 ea. (4 foot or longer) galvanized augur anchors secured into lake bottom.Dock secured with 1⁄2” long link galvanized chain and 3⁄4” galvanized shackles to augur anchorsRamp installed from shore to new dock in proper location and adjusted for changing water depths, wind, and wavesAll exposed edges must be smooth and free of sharp or jagged edges.DELIVERY LOCATION

    From: Federal Government (Federal)

  • Notice of Application for State Water Quality Certification - George Inlet Cannery

    Type : Bid Notification

    Due : 02 May, 2024 (in 7 days)
    Posted : 13 days ago
    Started : 12 Apr, 2024 (12 days ago)

    Project Site (Latitude, Longitude): 55.382800, -131.46950.Purpose: The Stated Purpose of the project is to provide bus and truck access for the 1912 cannery structure, upgrade and repair the cannery as a tourist destination and create an enonomic engine for the Cape Fox Corporation and employment for the shareholders.Description of Proposed Work: Proposed work in summary is to include: The installation of a new dock, two 6'x60' aluminum ramps, a float

    From: Alaska (State)

  • Caxambas Park and Boat Ramp Rehabilitation Project

    Type : Bid Notification

    Due : 03 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 06 Oct, 2023 (6 months ago)

    gangwayLS1 Section 10 – Alternate for Floating Dock 11.2Relocate floating dock no. 1 to east of boat ramp, install new gangwayLS1 A revised Bid Schedule (23-8182 Bid Schedule rev) has been uploaded into BidSync.

    From: Collier County (County)

  • Palm Valley West Boat Ramp Improvements

    Type : Bid Notification

    Due : 06 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 01 Jun, 2022 (23 months ago)

    Sealed bids delivered to or received by the SJC Purchasing Division after the above submittal deadline shall not be considered and shall be returned unopened to the addressee.Scope of WorkThe scope of work shall include providing all labor, materials, equipment, and any other items necessary to construct a new concrete boat ramp, construct a new fixed wooden dock with a new floating dock and gangway, construct new sidewalk, ......Show More DocumentsDownload

    From: St. Johns (County)

  • Palm Valley West Boat Ramp Improvements

    Type : Bid Notification

    Due : 06 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 01 Jun, 2022 (23 months ago)

    Sealed bids delivered to or received by the SJC Purchasing Division after the above submittal deadline shall not be considered and shall be returned unopened to the addressee.Scope of WorkThe scope of work shall include providing all labor, materials, equipment, and any other items necessary to construct a new concrete boat ramp, construct a new fixed wooden dock with a new floating dock and gangway, construct new sidewalk, ......Show More DocumentsDownload

    From: St. Johns (County)

  • Seal Cove and Shawatlans Docks - RFP 23-0097

    Type : Bid Notification

    Due : 21 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 05 Jun, 2023 (10 months ago)

    Seal Cove Dock/Piles must incorporate the current ramp/gangway and existing boat house. Existing dock is preferred to be reused, refurbished and reutilized. Piles however need to be replaced. Shawatlans Dock is required to be replaced. Old ramp may be refurbished to fit new system, or proponent can proposed a new ramp gangway.

    From: MerX (Federal)

  • Covered Pad & Loading Dock Repair NGBID-20-B-0014

    Type : Bid Notification

    Due : 20 Mar, 2020 (about 4 years ago)
    Posted : about 3 years ago
    Started : 05 Mar, 2020 (about 4 years ago)

    The new loading sock will be constructed with reinforced concrete footings, foundations, and concrete ramp and loading dock walls. Project also includes new dock bumpers and steel edge protection.

    From: Abadan Reprographics and Imaging (Other)