Search results for: ramp facility improvements

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 91
  • ITB 2018-096-SOLOMONS BOAT RAMP FACILITY IMPROVEMENTS

    Type : Bid Notification

    Due : 06 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 09 Mar, 2018 (about 6 years ago)

    Header InformationBid Number: MDCAL31037594 Description: ITB 2018-096-SOLOMONS BOAT RAMP FACILITY IMPROVEMENTS Bid Opening Date: 04/06/2018 02:30:00 PM Purchaser: Charlotte M.

    From: Maryland (State)

  • Willoughby Boat Ramp Facility Improvements

    Type : Bid Notification

    Due : 11 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 10 Mar, 2023 (13 months ago)

    Post InformationPosted At:Fri, Mar 10, 2023 10:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No1. Introduction1. SummaryThis project consists of timber pier repairs and timber pile replacement, timber shelter construction, concrete slab repairs, floating dock installation, water and electrical utility installation and mill and overlay existing asphalt pavement.2. BackgroundAll Requests for Information (RFIs) shall be submitted no later than 4:00 p.m. March 31, 2023 through the Questions portal at https://secure.procurenow.com/portal/norfolk/projects/38799. Any RFI submitted after this date cannot be guaranteed ...

    From: Norfolk (City)

  • RFP #24-001 - Fair Street Rehabilitation Project

    Type : Bid Notification

    Due : 01 May, 2024 (in 14 days)
    Posted : 5 days ago
    Started : 27 Mar, 2024 (20 days ago)

    The Fair Street Improvement Project will rehabilitate the existing road surface between E. 20th Street and E. Park Avenue (approx. .7 mile) consisting of a road diet (from two lanes in each direction to one in each direction), includes various bike lane treatments, a center twoway turn lane, drainage facility improvements, curbs, gutters, ADA conforming ramps and frontage improvements that consist of landscaping and irrigation.

    From: Chico (City)

  • RFP #24-001- Fair Street Rehabilitation Project

    Type : Bid Notification

    Due : 01 May, 2024 (in 14 days)
    Posted : 13 months ago
    Started : 18 Jan, 2024 (2 months ago)

    The Fair Street Improvement Project will rehabilitate the existing road surface between E. 20th Street and E. Park Avenue (approx. .7 mile) consisting of a road diet (from two lanes in each direction to one in each direction), includes various bike lane treatments, a center two way turn lane, drainage facility improvements, curbs, gutters, ADA conforming ramps and frontage improvements that consist of landscaping and irrigation.

    From: Chico (City)

  • Roundabout-Princeton Avenue (US206Z) and Brunswick Circle Extension (CR645)

    Type : Bid Notification

    Due : 05 Jan, 2024 (3 months ago)
    Posted : 5 months ago
    Started : 13 Nov, 2023 (5 months ago)

    Construction will include concrete curb and ADA sidewalk ramp improvements, bicycle ramp facilities, drainage improvements, bituminous asphalt roadway resurfacing, signage and striping, landscaping, lighting improvements, and utility relocations. Resurfacing will be constructed within project limits, tying into the adjacent Intersection Improvements project located at Princeton Avenue (CR 583) and Mulberry Street.

    From: Mercer County (County)

  • 2023 Accessible Ramp Improvements

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 6 days)
    Posted : 7 days ago
    Started : 25 Mar, 2024 (22 days ago)

    Sealed Bids for the 2023 Accessible Ramp Improvementswill be received by the City of Chesterfield Department of Public Works, 690 Chesterfield Pkwy W, Chesterfield, Missouri, 63017-0760 until 10:00 a.m. (prevailing central time) on Tuesday, April 23, 2024 and will thereafter be publicly opened and read aloud. The project consists of Sidewalk removal and replacement, pavement replacement, seeding, property restoration and other incidental work.

    From: Chesterfield (City)

  • ITB - Pipe Pins & Elastomeric Leveling Pads on I-405, Brickyard to SR 527

    Type : Bid Notification

    Due : 24 Apr, 2024 (in 7 days)
    Posted : 10 days ago
    Started : 22 Mar, 2024 (25 days ago)

    This project includes new lanes, direct access ramps, interchange improvements, Stride bus rapid transit stations and related facilities, and new fish passage culverts within the project vicinity. Closing Date: Wednesday, April 24, 2024Organization: Skanska USA Civil WestPoint of Contact: teresa.maxwell@skanska.com

    From: Ben Franklin Transit (Transportation)