Type : Bid Notification
Project Description :
Project Description :
One (1) project with roadway pavement, curb and sidewalk restoration and construction. 7. One (1) project which required temporary diversion of sewer flows, water services and sewer laterals while maintaining flows and services to properties. 8. One (1) project which required the removal, management and disposal of designated/hazardous materials, including asbestos. AND b.
The Snake River Wastewater Treatment Plant, an Enterprise Fund of Summit County Government, is currently soliciting proposals to provide concrete and sealant repairs to its treatment facility emergency overflow basin. Contractor shall furnish all labor, materials, transportation, mobilization, disposal and incidentals necessary to perform the removal of spalled/delaminated concrete and sealant material from the emergency overflow basin at the Snake River Wastewater Treatment Plant. The best proposal will be selected for award based upon consideration of qualifications, relevant experience, schedule and cost. The full Request for Proposals may be found at
Supplier Name:- UPPER CANAL IRRIGATION Buyer:- TStock
Supplier Name:- HOLLADAY CITY Buyer:- TStock
Contractor - Urgent Flood Damage Reinstatement Project Description :Scope of Work/Overview:To reinstate areas impacted by flood back to their original state approximately 200-300 square feet of area was impacted by the flood. This consists of carpet tiles, drywall, insulation, ceiling tiles, vinyl baseboard, vinyl wallpaper, electrical and data lines, guards for escorting. IT department may require relocation during the work. Anticipated award date: August 29, 2023 Anticipated construction start date: September 8, 2023 Anticipated construction end date: November 24, 2023
The Town of Richmond is seeking a qualified contractor to clean up the flood damage from approximately 6 inches of water intrusion of the Town Center basement and crawl space. Description of Project On July 10-11, 2023 the Town Center basement experienced some minor flooding that did not damage any mechanical and electrical equipment. The basement is cement flooring with part of the basement and crawl space being dirt floor.