Type : Bid Notification
The project scope includes, but is not limited to, furnishing of all materials, labor, equipment, demo and reconstruction of existing sidewalk, installation of storm sewer system materials (including but not limited to structures, pipe, and bedding), installation of curb and gutter, installation of four (4) pedestrian bridges, tree removal, grading, utility coordination, storm drainage, erosion control, traffic control, stabilization of disturbed