Type : Contract
IGF: CT: IGF PROVIDE REDUNDANT HVAC SYSTEM AT SBT (DB) 672-21-106 Solicitation ID/Procurement Identifier: 36C24821R0033 Ultimate Completion Date: Sat Sep 30 17:00:00 GMT 2023
IGF: CT: IGF PROVIDE REDUNDANT HVAC SYSTEM AT SBT (DB) 672-21-106 Solicitation ID/Procurement Identifier: 36C24821R0033 Ultimate Completion Date: Sat Sep 30 17:00:00 GMT 2023
Tender No: RFX6000001904 Briefing Meeting: 2024-04-12 10:00 Tender Closing Date: 2024-04-18 12:00 Required At: SENTECH Details :- Tender Notice and Invitation to Tender Appointment of a service provider to replace one redundant Apache HVAC unit at Alpha Room, with one new Apache HVAC unit and connect into the existing ducting at Sentech Head Office.
This essential community facility which includes space for 12 dispatch consoles, administrative space, an EOC/training room, communications systems, emergency power generator, redundant HVAC systems, and a 140-foot tall communications tower with microwave and radio antennas of various types. Access to the site will be gained through a private road at the adjacent Lowe's on the west side of the site.
The scope of work consists of the following: The project will construct a multi-story communication center to include administrative spaces, support spaces, equipment/operational spaces, communication maintenance/training spaces, showers, toilets, storage spaces, below grade cable vaults, raised flooring, moveable interior walls, under-floor fire suppression system, access control system, climate direct digital control system (DDC), redundant HVAC
No Description Provided Contact Information: Ashley Bryan 9104512582 Office Address :N40085 NAVFAC Mid-Atlantic, ROICC Camp Lejeune Naval Facilities Engineering Command, Mid-Atlantic 1005 Michael Road Room 20 Camp Lejeune, NC Location: NAVFAC Mid-Atlantic, ROICC Camp Lejeune Set Aside: Award Number: N4008514D7742 18F7184 Award Amount : $1140850 Award Date: 092718 Awardee: Mechworks Mechanical Contractors Inc.
Contiguous and integrated to the office space located on the same floor and at grade.The “Operations Room” and “Equipment Room” will require 24/7 cooling and a 100% independently redundant HVAC system separate from the base building systems.
Heating, Ventilation and Air Conditioning (HVAC) water-cooled chillers with air-cooled chillers; and installing dedicated HVAC for Ground Control Station (GCS) bays.