Search results for: rehabilitation and ada curb

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 321
  • Prairie Center Drive Pavement Rehabilitation Project

    Type : Bid Notification

    Due : 09 May, 2024 (in 10 days)
    Posted : 10 days ago
    Started : 03 Apr, 2024 (25 days ago)

    Description: Project Category Code:Manhole Rehabilitation, Street/Road Intersection Improvements, Traffic Control Devices (Signals, Signing, etc.), Aggregate, Sidewalks/Curbs/Gutters, Street/Road Pavement Marking, Asphalt Overlay, Rehab. and/or Maint., Street/Road Asphalt Milling, ADA Curb Ramps, Traffic Control, Revised Signal System, Traffic Control Signal Systems, Curbs, Asphalt Pulverizing, Paving (Highway, Road or Street) Solicitor Details Solicitor

    From: Eden Prairie (City)

  • Chumash Park Rehabilitation Project

    Type : Bid Notification

    Due : 09 Apr, 2024 (19 days ago)
    Posted : 1 month ago
    Started : 08 Mar, 2024 (1 month ago)

    The Project includes, without limitations, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary for the removal and hauling of existing playground sand, concrete, asphalt, dirt, roots, and grass as necessary to construct concrete sidewalk, ADA curb ramps, and utilities.

    From: Agoura Hills (City)

  • BID PACKAGE - FY 2023-2024 PAVEMENT REHABILITATION PROJECT

    Type : Bid Notification

    Due : 09 Apr, 2024 (19 days ago)
    Posted : 1 month ago
    Started : 12 Mar, 2024 (1 month ago)

    Improvements include concrete sidewalk replacement, concrete curb and gutter replacement, installation of ADA curb ramps, replacement of concrete cross gutters, installation of concrete alleyway, slurry seal, AC coldmill, AC overlay, AC pavement removal & construction, installation of speed cushions and associated signage, traffic signal modifications, restoration of traffic loops, traffic striping, traffic legends, arrow markings, and other work

    From: City of Commerce (City)

  • 2022-23 Street Rehabilitation at Various Locations

    Type : Bid Notification

    Due : 28 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 14 Feb, 2023 (14 months ago)

    and Milling, Paving (Highway, Road or Street), Sawcutting/Sidewalk/Pavement, Street/Road Asphalt Milling, ADA Curb Ramps, Asphalt Pulverizing, Paving (Parking Lot Paving), Paving (Asphalt or Concrete)Description:Project consists of cold milling the existing asphalt pavement and constructing a rubberized asphalt overlay, adjusting utility covers to grade, constructing new ADA curb ramps, replacing traffic loop detectors, restoring traffic striping

    From: Monterey Park (City)

  • 2023-24 STREET REHABILITATION AT VARIOUS LOCATIONS

    Type : Bid Notification

    Due : 21 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 17 Aug, 2023 (8 months ago)

    and Milling, Paving (Highway, Road or Street), Sawcutting/Sidewalk/Pavement, Street/Road Asphalt Milling, ADA Curb Ramps, Asphalt Pulverizing, Paving (Parking Lot Paving), Paving (Asphalt or Concrete)Description:Project consists of cold milling the existing asphalt pavement and constructing a rubberized asphalt overlay, adjusting utility covers to grade, constructing new ADA curb ramps, replacing traffic loop detectors, restoring traffic striping

    From: Monterey Park (City)

  • Wood Avenue Rehabilitation Project (2023-WAR)

    Type : Bid Notification

    Due : 14 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 19 Jun, 2023 (10 months ago)

    Modifications include but are not limited to; construction of ADA curb ramps; curb bump outs; sidewalk; drainage; concrete base repair; asphalt paving; and all necessary appurtenant work and materials required to complete the work indicated.

    From: Pennsylvania (State)

  • 2021 SEWER REHABILITATION PROJECT (RE-BID)

    Type : Bid Notification

    Due : 28 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 14 Jun, 2023 (10 months ago)

    This includes traffic control, coordinating with other utilities and agencies, tree protection, private property and surface settlement monitoring, vibration monitoring, utility settlement monitoring, surface removal, excavation, dewatering, temporary sewer bypass, side sewer reconnections, replacing pipe, pipe fittings, maintenance holes and channels, bedding, jet cleaning, CCTV inspection, backfilling, pavement & landscape restoration, new ADA curb

    From: Seattle (City)