Search results for: rehabilitation and traffic

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 5,230
  • IFB158807 Pipe Rehabilitation Services

    Type : Bid Notification

    Due : 03 May, 2024 (in 3 days)
    Posted : 19 days ago
    Started : 10 Apr, 2024 (19 days ago)

    LOT 1 - FAIRFAX RESIDENCY - VIDEO SERVICES Bid price shall be by the hour for video inspection to include but not limited to necessary equipment with experienced operator, labor, fuel, transportation, tools, supplies, supervision and any incidentals. Video inspections will be paid by the hour with a four (4) hour minimum. NIGP Code: 96292 Video Scanning of Sewers, Water Wells, etc. Quantity: 12.00000 Hour Delivery Date: l1_5.

    From: Virginia (State)

  • RR-23-4940 - Bridge Rehabilitation

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 2 months ago
    Started : 29 Jan, 2024 (3 months ago)

    RR-23-4940 - Bridge Rehabilitation The work under this contract includes, but is not limited to cleaning abutment bridge seats, applying concrete sealant, structural repair of concrete, remove and reinstallation of bird spikes at abutments, beam repairs, temporary support and cribbing for existing beams to repair existing pedestals, maintenance of traffic and other miscellaneous work.

    From: Illinois tollway (State)

  • IFB 2024-065 Liberty University Walkway Bridge Rehabilitation

    Type : Bid Notification

    Due : 01 May, 2024 (Tomorrow)
    Posted : 26 days ago
    Started : 03 Apr, 2024 (26 days ago)

    Summary: The project is to repair the Liberty University Walkway Pedestrian Bridge over Wards Road and Rock Castle Creek, structure number 5000, located in Lynchburg, Virginia. It involves concrete repairs, blasting, bonding epoxy overlay, reinforcing steel, traffic control, protective coating of steel members and erosion and sediment control.

    From: Virginia (State)

  • Large Diameter Combined Sewer Rehabilitation

    Type : Bid Notification

    Due : 07 May, 2024 (in 7 days)
    Posted : 1 month ago
    Started : 26 Feb, 2024 (2 months ago)

    The improvements include rehabilitation of existing 90”, 96”, 108” combination sewer by spray-on geopolymer method, the CIPP lining an existing 30” diameter RCP pipe, bypass pumping, sewer cleaning and televising, manhole lining, lateral service connections, sewer cleanouts, sewer point repairs, and traffic control protection.

    From: Christopher B Burke Engineering (Co-op)

  • FY2021-22 Traffic Signal Rehabilitation

    Type : Bid Notification

    Due : 14 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 23 Sep, 2021 (about 2 years ago)

    Project Title FY2021-22 Traffic Signal Rehabilitation Invitation # 8746-1 Bid Posting Date 09/23/2021 2:15 PM (PDT) Project Stage Bidding Bid Due Date 10/14/2021 10:00 AM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment Type of Award Lump Sum Categories 96883 - Traffic Signal Maintenance And Repair

    From: Newport Beach (City)

  • ROBERTS AVENUE AND SURF WAY PAVEMENT <b>REHABILITATION</b> PROJECT (35c1553)

    ROBERTS AVENUE AND SURF WAY PAVEMENT REHABILITATION PROJECT (35c1553)

    Type : Bid Notification

    Due : 30 Apr, 2024 (Today)
    Posted : 1 month ago
    Started : 25 Mar, 2024 (1 month ago)

    In general, the work consists of, but is not limited to, concrete sidewalk and curb and gutter repairs, clearing and grubbing, demolition and restoration of asphalt dike, pavement rehabilitation by way of full depth reclamation, excess material offhaul and placement of HMA, adjustments of utilities boxes, and installation of traffic markings and striping, including all necessary storm water protection and traffic control measures.

    From: Monterey (City)

  • Long Quarter North Structural Rehabilitation

    Type : Bid Notification

    Due : 14 May, 2024 (in 14 days)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    23002 SX0: Long Quarter North Structural Rehabilitation Work includes the rehabilitation of sanitary sewer pipe and sanitary manhole, sanitary bypass pumping during sewer rehabilitation work, traffic controls on State and County roads and pedestrian detour, surface restoration including State and County road pavements, sidewalks, curbs and gutters, and grass seeding, erosion and sediment control for the project site.

    From: Baltimore (County)