Type : Award
FODO 253278 - Lead Paint Remediation in Interior and Exterior of Visitor Center at Fort Donelson National Battlefield
FODO 253278 - Lead Paint Remediation in Interior and Exterior of Visitor Center at Fort Donelson National Battlefield
The project will consist of miscellaneous remediations to interior and exterior building elements due to poor soil conditions. Exterior remediations include removing and replacing sections of concrete sidewalks and heavy-duty paving and tying all existing roof downspouts into the underground storm drainage system.
The project will consist of miscellaneous remediations to interior and exterior building elements due to poor soil conditions. Exterior remediations include removing and replacing sections of concrete sidewalks and heavy-duty paving and tying all existing roof downspouts into the underground storm drainage system.
Exterior remediations include removing and replacing sections of concrete sidewalks and heavy-duty paving and tying all existing roof downspouts into the underground storm drainage system. Interior remediations include removing several water closets and concrete slab section below, removing and replacing expansive soils beneath, re-pouring concrete slab section, re-installing water closets, and refinishing the concrete slab at these areas.
Exterior remediations include removing and replacing sections of concrete sidewalks and heavy-duty paving and tying all existing roof downspouts into the underground storm drainage system. Interior remediations include removing several water closets and concrete slab section below, removing and replacing expansive soils beneath, re-pouring concrete slab section, re-installing water closets, and refinishing the concrete slab at these areas.
Remediation- swipe and soil samples • Industrial Hygiene • Construction Monitoring Program (CMP) • Radiation Protection (RP) https://www.phai.ca/ Contact Information :-Singh Sukhman sukhman.singh@cnl.ca
Project also includesreplacement of finishes removed as part of the mold remediation and removal of hazardousmaterial specific to mold remediation to interior finishes.