Search results for: removal and friction

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,196
  • LINING, FRICTION

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 4 days)
    Posted : 6 days ago
    Started : 19 Apr, 2024 (5 days ago)

    OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 23 PAGES SPE7L1-24-T-311G SECTION B PR: 7007261179 NSN/MATERIAL:3040005423699 ITEM DESCRIPTION LINING,FRICTION LINING,FRICTION RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

    From: Federal Government (Federal)

  • Rubber removal and friction testing 2021

    Type : Bid Notification

    Due : 27 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 05 Aug, 2021 (about 2 years ago)

    Rubber removal and friction testing 2021 Status: Open QQ EVA001_QQ239416 Capital Region Airport Commission Closing On: 8/27/21 2:00 PM Time Left: 5 days, 12 hours QQ Construction Closing On: 8/27/21 2:00 PM Time Left: 5 days, 12 hours View Opportunity Add to Favorites   View Opportunity Add to Favorites

    From: Virginia (State)

  • Rubber Removal and Friction testing 2022

    Type : Bid Notification

    Due : 24 Aug, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 17 Aug, 2022 (20 months ago)

    Byrd Terminal Drive Richmond International Airport, VA 23250-2400 US Attention: Capital Region Airport Commission Product Specs NIGP Code: 90518 Airport Runway Friction Testing Vendor Part Number: Brand Name: Comments: Rubber removal area 1500ft x 50 x 2 on runway 16/34 and 1000ft x 50 x 2 on runway 2/20 Addtional Terms: Method of cleaning with high pressure water/chemical, no grinding 2.Runway Friction test for 2 runways (both ends) Quantity: 1 each

    From: Virginia (State)

  • RUNWAY RUBBER REMOVAL AND FRICTION MEASUREMENT SERVICES

    Type : Bid Notification

    Due : 08 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 26 Jun, 2018 (about 5 years ago)

    Solicitation #:2018-1556Title:RUNWAY RUBBER REMOVAL AND FRICTION MEASUREMENT SERVICES Status: EVALUATION Department:Airport Type: General Deposit: N/A Date Issued:06/26/2018Date scheduled on Agenda:-tbd-Due Date:08/08/2018Contact:Rebecca L. TorresLink: You must be signed-up and signed-on to view or download the specifications of this solicitation.

    From: El Paso (City)

  • 10.72 mi of guardrail removal and replacement, removal of two emergency crossovers, high friction su...

    Type : Bid Notification

    Due : 06 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Feb, 2020 (about 4 years ago)

    Proposal 09101-127506 10.72 mi of guardrail removal and replacement, removal of two emergency crossovers, high friction surface treatment and pavement markings on US-10 from I-75 to Flajole Road in the city of Auburn, Bay County. ** 2871 N9-6L **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N7.

    From: Michigan Department of Transportation (Transportation)

  • LINING, FRICTION

    Type : Bid Notification

    Due : 22 Apr, 2024 (2 days ago)
    Posted : 12 days ago
    Started : 12 Apr, 2024 (12 days ago)

    OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 23 PAGES SPE7L1-24-T-295A SECTION B PR: 7007160865 NSN/MATERIAL:2530013955242 ITEM DESCRIPTION LINING,FRICTION LINING,FRICTION RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

    From: Federal Government (Federal)

  • RT3 Friction Meter

    Type : Bid Notification

    Due : 27 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 22 Aug, 2019 (about 4 years ago)

    Must be used in extreme winter contaminant conditions for snow and ice removal testing and snow and ice control friction measurements. Must work reliably and accurately in -40 degrees F to 110 degree F temperatures. c. Be able to conduct winter tests, including snow and ice conditions at speeds of 15mph to 60mph based on safe operating speeds for the weather conditions. d.

    From: Federal Government (Federal)