Search results for: removal of interior

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,034
  • Distribution Center Renovation - New Loading Doors and Removal of Interior Office

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 22 Nov, 2022 (17 months ago)

    Distribution Center Renovation - New Loading Doors and Removal of Interior Office Project Description :The project consists of a Distribution Center Renovation: new loading doors and the removal of an interior office at Nova Scotia Liquor Corporation Head Office, 93 Chain Lake Drive, Halifax, NS (the “Project”).

    From: MerX (Federal)

  • White Oak Acoustical Tile Removal and Interior Painting

    Type : Bid Notification

    Due : 16 May, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 13 Apr, 2017 (about 7 years ago)

    Header InformationBid Number: MDD5031032429 Description: White Oak Acoustical Tile Removal and Interior Painting Bid Opening Date: 05/16/2017 10:00:00 AM Purchaser: Martha Jarboe Organization: Maryland Military Department Department: D50100 - FIFTH REGIMENT ARMORY Location: 50100 - FIFTH REGIMENT ARMORY Fiscal Year: 17 Type Code: IT - Invitation to Bid (ITB) Allow Electronic Quote: No Alternate Id: Required Date: Available Date : 04/13/2017 04:

    From: Maryland (State)

  • RiverCenter Ramp | Interior Pedestrian Walkway Demolition and Upgrades

    Type : Bid Notification

    Due : 07 May, 2024 (in 8 days)
    Posted : 9 days ago
    Started : 16 Apr, 2024 (12 days ago)

    The City of Davenport is accepting bids from qualified contractors for the Removal of the Interior Pedestrian Walkway in the RiverCenter Ramp. The Demolition is for the enclosed walkway on 2nd Level of the River Center Ramp and upgraded flooring to the Sky Bridge over 2nd Street.

    From: Davenport (City)

  • Relocation and Renovation of Recruiting Office

    Type : Bid Notification

    Due : 24 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 22 Jul, 2020 (about 3 years ago)

    The Contractor shall provide all construction services and materials for demolition and construction of new recruiting office spaces located in Building #1:Demolition to include removal of interior door, closet, molding, flooring, ceiling track, and ceiling system. 

    From: Federal Government (Federal)

  • Beltz Water Treatment Plant Filter Rehabilitation Project CWO#2021-002

    Type : Bid Notification

    Due : 13 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 12 Mar, 2021 (about 3 years ago)

    The work shall include welding internal filter underdrain piping, repair or replacement of internal filter laterals and header piping, replacing components of the manway and any damaged or missing bolts or anchor bolts, removal of interior lining using �White Metal Blast Cleaning� (SSPC/SP #5), water blasting of exterior coating, applying new coating to interior and overcoat exterior of filter vessel, installation of new filter media, and disinfection

    From: Santa Cruz (City)

  • Relocation and Renovation of Recruiting Office

    Type : Pre-Bid Notification

    Due : 30 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    Demolition will include removal of interior door, closet, moulding, flooring, and ceiling system.  HVAC systems will be removed and replaced.Construction will include a new floor plan to installing new door and modular wall construction, new flooring, ceiling system, finishes, tile, and electrical. 

    From: Federal Government (Federal)

  • Schwartz Hall Renovations for Lounge - 2018

    Type : Bid Notification

    Due : 01 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 17 Jul, 2018 (about 5 years ago)

    Project is for interior renovations to approximately 1,624 square feet (net). of existing space into a Student Lounge complete with a Restroom and small Kitchenette. 2. Demolition includes but may not be limited to; removal of existing flooring, removal of interior partitions, removal of the suspended ceilings, removal of the existing light fixtures and removal of miscellaneous MEP systems.

    From: Connecticut (State)