Type : Bid Notification
Building repairs to the Jones Park Storage Building. Remove existing doors. Remove/fill in openings in CMU wall as indicated in the drawings, for new doors and louvers. Repoint CMU walls 100% exterior and interior. Repairs to existing roof edge including installation of wood blocking with new drip edge, aluminum cladding and asphalt shingle with underlayment.