Type : Bid Notification
1 VAN 115518 Bridge Preservation VAN CR 124 0.14 1/1/2027 $216,640 Standard Build Replace existing bridge with a new structure.
1 VAN 115518 Bridge Preservation VAN CR 124 0.14 1/1/2027 $216,640 Standard Build Replace existing bridge with a new structure.
M-24-032H Replace existing wastewater treatment plant and sewer lines with a new Aerobic Treatment Unit Job# 42-24 FOB: Waldron 05/07/2024 04:00 PM UTC
The project shall consist of: The project looks to replace existing sidewalks along the north side of Vine Street on the street between 5th and Broadway, in downtown Poplar Bluff, MO. The new sidewalk will be the same width as previously and with ADA requirements as much as possible.
7 4/18/24, 10:40 AM Bid Express :: Solicitations :: M-24-032H Sewer Replacement Replace existing wastewater treatment plant and sewer lines with a new Aerobic Treatment Unit at the Waldron Rest Area, Waldron, AR.
2 WOO 118539 Bridge Preservation WOO MR 746 0.05 Pemberville Brdg 7/1/2025 $74,910 Standard Build Project in Village of Pemberville to completely replace existing bridge structure (#8758948) over Portage River.
C109494 - NLM 38A REPLACE EXISTING UPS SYSTEM Solicitation ID/Procurement Identifier: 75N99019D00024 Ultimate Completion Date: Fri Jul 05 17:00:00 GMT 2024
ITB24-046 BAB BUILDING ROOF REPLACEMENT The Kenai Peninsula Borough hereby invites qualified contractors to provide all labor & materials to replace existing BUR system with EPDM, to include internal roof drain systems and electrical hardware as defined in bid documents. A pre-bid conference will be held on April 11, 2024, at 9:00 AM at the Kenai Peninsula Borough Building Front Entrance located at 144 North Binkley, Soldotna, AK 99669.