Search results for: replace existing flooring

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 262
  • Remove and Replace Existing Flooring in the Historic Peck Center

    Type : Bid Notification

    Due : 20 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 21 Aug, 2023 (8 months ago)

    Bid Details Remove and Replace Existing Flooring in the Historic Peck Center Active Browse Awarded Bids Download Bid Package Bid Details Agency Name City of Fernandina Beach, FL Bid Writer Wanda Weaks Bid ID ITB-ITB 23-24-0-2023/WW Bid Type ITB - Invitation to Bid Broadcast Date 08/21/2023 1:45 PM Eastern Fiscal Year 2023 Due Date 09/20/2023 2:00 PM Eastern Bid Status Text NOTICE OF INVITATION TO BID The City of Fernandina Beach will receive sealed

    From: City of Fernandina Beach (City)

  • Labor, Materials, and Equipment needed to Remove and Replace Existing Flooring in the Gymnasium at The Kennedy Heights Playground

    Type : Bid Notification

    Due : 28 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 25 Oct, 2023 (6 months ago)

    THIS SECTION MUST BE COMPLETED BY BIDDER: INVITATION TO BID FROM JEFFERSON PARISH - continued DATE: BID NO.: Page SEALED BID ITEM NUMBER QUANTITY U/M DESCRIPTION OF ARTICLES UNIT PRICE QUOTED TOTALS 10/25/2023 50-00143778 7 1.00 1 JOB Labor, Materials, and Equipment needed to Remove and Replace Existing Flooring in the Gymnasium at The Kennedy Heights Playground 0001 KENNEDY HEIGHTS GYM FLOOR- LABOR, MATERIALS AND EQUIPMENT TO REMOVE EXISTING VINYL

    From: Louisiana (State)

  • TO REPLACE EXISTING FLOORING IN BLDG 10, ELEVATOR 12 AND BLDG 33, ELEVATOR 3 WITH ALUMINUM DIAMOND PLATE FLOORING

    Type : Contract

    Due : 31 May, 2023 (11 months ago)
    Posted : 13 months ago
    Started : 31 Mar, 2023 (13 months ago)

    TO REPLACE EXISTING FLOORING IN BLDG 10, ELEVATOR 12 AND BLDG 33, ELEVATOR 3 WITH ALUMINUM DIAMOND PLATE FLOORING Solicitation ID/Procurement Identifier: 75N99018A00015 Ultimate Completion Date: Wed May 31 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • TILE/CARPET WORK

    Type : Bid Notification

    Due : 29 Mar, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 14 Mar, 2018 (about 6 years ago)

    I01416 TILE/CARPET WORK Abstract: This project requires the successful proposer(s) to provide all the necessary resources to REMOVE AND REPLACE EXISTING FLOORING in accordance with the scope of services/work, terms and conditions specified in the in the RFP. General Services 3/29/2018 richard.brandt @houstontx.gov 22

    From: Houston (City)

  • N--Access Flooring and Substructure System Upgrade Project for the VA Hines Information Technology Center (HITC)

    Type : Bid Notification

    Due : 08 Sep, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 29 Aug, 2017 (about 6 years ago)

    In order to keep DCO information technology (IT) center operational at Hines ITC computer room without facility maintenance related disruptions it is necessary to replace existing flooring and substructure. Existing heat pump systems have failed and/or at the end of their life expectancy cycle. All heat pump systems are cooled via closed loop with treated water and contractor shall replace/install with like kind.

    From: Federal Government (Federal)

  • IFB C5611291-D Re-Bid 1 Epoxy Flooring Installation @ CSP-SAC

    Type : Bid Notification

    Due : 13 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 30 May, 2023 (11 months ago)

    The Contractor shall replace existing flooring and install new Epoxy Based Resinous Flooring and shall be compensated for the services in accordance with the rates specified in Exhibit B-1, Public Works Rate Sheet.

    From: California (State)

  • IFB C5611291-D EPOXY BASED RESINOUS FLOORING INSTALLATION

    Type : Bid Notification

    Due : 29 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 06 Feb, 2023 (14 months ago)

    The Contractor shall replace existing flooring and install new Epoxy Based Resinous Flooring and shall be compensated for the services in accordance with the rates specified in Exhibit B-1, Public Works Rate Sheet.

    From: California (State)