Search results for: replace existing fuel oil

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 57
  • Replace existing fuel oil system with natural gas system, Camp Hovey, Korea(MATOC only)

    Type : Bid Notification

    Due : 16 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 31 May, 2023 (11 months ago)

    Replace existing fuel oil system with natural gas system, Camp Hovey, KoreaThis is a Request for Proposal (RFP) issued to existing Area I & II General Construction Multiple Aw ard Indefinite Delivery Indefinite Quantity(MAIDIQ) Contractors only. Contract Number: W91QVN-18-D-0021, 0022, 0025, 0027, 0028, 0042, 0044, 0046 & 0050.

    From: Federal Government (Federal)

  • Replacement of Furnaces - Fountain City, WI

    Type : Bid Notification

    Due : 15 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 27 Aug, 2020 (about 3 years ago)

    Paul District seeks a contractor to replace three existing fuel oil burning furnaces at the Mississippi River Project Office, Fountain City, Wisconsin. The contractor shall replace existing furnaces with High Efficiency Liquid Propane furnaces. Current furnaces are old and the dampers don’t work properly causing them to run very inefficiently.

    From: Federal Government (Federal)

  • GAOA Timberline Lodge Boiler

    Type : Bid Notification

    Due : 04 Jun, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 28 May, 2021 (about 2 years ago)

    The existing steam boilers will remain.3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.4.  Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.5. Bid Item  003: Install new main hot water piping in the boiler room.

    From: Federal Government (Federal)

  • Slate Creek Residence HVAC Replacement / Nez Perce-Clearwater N.F. / Salmon River R.D.

    Type : Pre-Bid Notification

    Due : 15 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Jul, 2021 (about 2 years ago)

    Work for this project consists of providing labor and materials to remove existing oil furnace and fuel tank and replace with an electric forced air heat pump for Residence #1001, #1002, and #1003; Residence #1002 shall be considered for an optional item. The 3-ton capacity heat pump shall have a minimum SEER rating of 15, HSPF 8.5, and EER of 12.5.  Units shall have a minimum 10 year warranty. 

    From: Federal Government (Federal)

  • USCGC Bertholf Incinerator Repair

    Type : Bid Notification

    Due : 03 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 20 Oct, 2023 (6 months ago)

    The Contractor must modify the existing fuel lines as needed and replace the primary burner oil nozzle and secondary burner oil nozzle in accordance with the Coast Guard TP 7170.NOTE The currently installed Primary and Secondary Nozzles will be changed over to a new configuration in order to match the rest of the fleet. Installation of new oil nozzles requires relocation of fuel lines.

    From: Federal Government (Federal)

  • NEZ PERCE-CLEARWATER NATIONAL FOREST / Wood Shed Furnace Replacement

    Type : Bid Notification

    Due : 08 Nov, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 26 Oct, 2018 (about 5 years ago)

    Work for this project consists of providing labor and materials to remove existing oil furnace and fuel tank, and replace with an electric forced air heat pump in the Wood Shed located, on the Nez Perce-Clearwater National Forests Salmon River Ranger District in White Bird, ID.

    From: Federal Government (Federal)

  • Y--Improve Site Utilities Project #541-16-103

    Type : Bid Notification

    Due : N/A
    Posted : about 7 years ago
    Started : 12 Apr, 2016 (about 8 years ago)

    - Site Lighting - Replace and upgrade site lighting for safety and improved aesthetics.g. 7 - Generator Exhaust - Revise generator exhaust and add plume exhaust fans to direct the generator exhaust high above hospital air intakes. h. 8 - Fuel Oil Improvements - Replace two existing fuel oil transfer pumps with new ones which will supply fuel oil to all five emergency generators.B.

    From: Federal Government (Federal)