Type : Bid Notification
Main items of work consist of but are not limited to the following: Install concrete slabs for new transformers and distribution panels, install electrical transformer and distribution panel, install precast concrete manhole, install electrical duct banks, install electric cables and utility pedestals on the piers, replace Pier 4, 1, and C utility pedestals and install ice suppression systems as per contract drawings and specifications.