Type : Bid Notification
SOLICITATION # 36C24921R0108For Project; 603-20-201 Replace SPS Air Handler
SOLICITATION # 36C24921R0108For Project; 603-20-201 Replace SPS Air Handler
Pre-Solicitation NoticeVA69D-17-B-0958Project: Replace SPS Cart WasherProject Number: 537-17-144Location: Jesse Brown VA Medical Center, Chicago, ILThe Jesse Brown VA Medical Center has a requirement to remove and replace one cart washer-disinfector being purchased by VA to be installed within the Sterile Processing Service, including utility connections, all within Building 40 The Bed Tower per the statement of work, specifications and drawings.
SPS facility, and complete cleanup of site.
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendm...
Page 2 of 2 The Robley Rex VA Medical Center Louisville, KY has a requirement to replace the Sterilization Preparation Services (SPS) Air Handler System for building 1. The contractor shall furnish all materials, equipment, and labor necessary to replace the SPS air handler system per specifications and drawings.
Added: Apr 25, 2017 11:29 am Modified: Jul 11, 2017 2:59 pm Track Changes No Description Provided
This will involve renting and setting up a fully functional onsite mobile SPS facility, removal of all the SPS equipment and other equipment in the SPS area, removal of all equipment from scope room, storage of the equipment, demolition, and removal of old flooring, installing the new flooring in SPS area and scope room area, reinstalling the SPS equipment, commissioning of the equipment, and removal of the mobile SPS facility, and complete cleanup