Search results for: replacement and associated work

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 6,016
  • Roof Replacement and associated work

    Type : Bid Notification

    Due : 01 May, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 10 Apr, 2019 (about 5 years ago)

    Roof Replacement and associated work Organization:Town of Norfolk Department:NFAC01 - Town Adminstrator Location:NTH01 - Town of Norfolk Procurement Bulletin Desc: Info Contact:Matthew Haffner

    From: Massachusetts (State)

  • Farley Roof Replacement and Associated Work

    Type : Bid Notification

    Due : 05 Jan, 2023 (16 months ago)
    Posted : 17 months ago
    Started : 07 Dec, 2022 (17 months ago)

    Bid Number:7766 Bid Title:Farley Roof Replacement and Associated Work Category:BidsStatus:Open Description: The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for IFB# 7766 Farley Roof Replacement and Associated Work Removal and replacement of current failing roofing system with a new single-ply thermoplastic system, skylight repairs, repairs to stairwell low- and steep-sloped sheet metal

    From: Framingham (City)

  • Roof Replacement and Associated Work at the Hartwell Building

    Type : Bid Notification

    Due : 08 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 18 Mar, 2020 (about 4 years ago)

    Roof Replacement and Associated Work at the Hartwell Building Organization:Town of Lincoln Department:TOL02 - Lincoln Public Schools Location:CEN01 - Central Office Bulletin Desc:The Town of Lincoln invites sealed proposals from Contractors for the: ROOF REPLACEMENT AND ASSOCIATED WORK AT THE HARTWELL BUILDING, Lincoln, Massachusetts, in accordance with the Contract Documents.

    From: Massachusetts (State)

  • Roof Replacement and Associated Work -Tyson Building

    Type : Bid Notification

    Due : 21 Nov, 2022 (17 months ago)
    Posted : 20 months ago
    Started : 24 Aug, 2022 (20 months ago)

    Roof replacement of six (6) existing asphalt shingle roof systems with new synthetic slate roofing. Removal and replacement of existing damaged natural slate shingles with new. The cost of the work is approximately $ . The work to be performed under this contract shall be completed on or before the Final Completion date of 20 October 2023. 1.

    From: Maine Department of Administrative and Financial Services (State)

  • Roof Replacement and Associated work at Conte Polymer Research

    Type : Bid Notification

    Due : 03 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 11 Apr, 2018 (about 6 years ago)

    Roof Replacement and Associated work at Conte Polymer Research. The work shall be completed on or before 100 days from the Notice to Proceed and in general the Project includes: Painting & Plumbing A pre-bid meeting will be held on April 17, 2018 at 10:00 a.m. at Conte Lobby 1st floor, 120 Governors Drive, Umass Amherst Project Manager Stephen Lobik 413-326-1651

    From: University of Massachusetts (Higher Education)

  • Replacement of Windows and Doors and miscellaneous associated work

    Type : Bid Notification

    Due : 14 Dec, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Nov, 2017 (about 6 years ago)

    Header InformationBid Number: BD-18-2029-BES01-BES01-21810 Description: Replacement of Windows and Doors and miscellaneous associated work Bid Opening Date: 12/14/2017 02:00:00 PM Purchaser: Steven Greenberg Organization: Boxford Elementary Schools Department: BES01 - Boxford Elementary Schools Location: BES01 - Boxford Elementary Schools Fiscal Year: 18 Type Code: NS Allow Electronic Quote: Yes Alternate Id: Required Date: Available Date : 11/

    From: Massachusetts (State)

  • Boiler Replacement and Associated Work at Milton Bradley School

    Type : Bid Notification

    Due : 06 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 23 Jan, 2024 (3 months ago)

    Bid 24-159 – The work at Milton Bradley School includes replacing Boiler work scope includes replacing five (5) existing gas fired hot water boilers with new high efficiency condensing boilers, venting and combustion air upgrades, disconnecting and reconnecting boilers, electrical power related to the disconnect and reconnection of the boilers, boiler controls and associated gas piping, replacement of two (2) existing domestic hot water storage

    From: Springfield (City)