Type : Bid Notification
Sprinkler Replacement Ne Roc Garage postdate:- 01/11/2023 responsedate:- 02/15/2023 03:00 PM EST Solicitation Number:- Locked Registered members only to solicitation details & future business opportunities.
Sprinkler Replacement Ne Roc Garage postdate:- 01/11/2023 responsedate:- 02/15/2023 03:00 PM EST Solicitation Number:- Locked Registered members only to solicitation details & future business opportunities.
Payment for concreie where removal and replacement is required will be withheld or recovered, and released after replacement has heen acceptably completed. 461.08 STORAGE OF MATERIALS Cement shall be stored in weather-tight building, bins, or silos which provide protection from dampness and contamination and wil] minimize warehouse set.
Electrolyte replacement approximately every 6 to 12 months. b. Membrane replacement approximately every 12 months. c. Working (gold) electrode polishing every 12 months. 2. Total Chlorine a. Electrolyte replacement approximately every 6 to 12 months. b. Membrane replacement approximately every 12 months. c. Working (gold) electrode polishing every 12 months. PART 2 PRODUCTS 2.1 MANUFACTURER A.
. =15 LL_ CONTRA Contractor Affidavit under O.C.G.A. 13-10-91(b)(1) By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement
For example: SAMPLE: client 2016 2017 2018 2019 2020 2021 Rockdale Wastewater VVastewater County Mainline Mainline Replacement Replacement City of Atlanta WWTP Improvements HCWA 18" Waterline 18" Waterline Replacement Replacement Include for each cateaorv for which vou are submittina for consideration.
Road Patching, as described herein, shall apply to the removal and replacement of failed areas, as indicated by the Engineer, on roads scheduled for resurfacing. 2. The "Road Patching" work is intended to cover the removal and replacement of relatively small failed areas of pavement.
Temporary replacement of a highway facility that is c mediately after the occurrence of a natural disaster of catastrophic failure to restore the highway for the health, welfare, and safety of the public. Ww Ww B.