Type : Bid Notification
Summary: L08_2024 BRIDGE REPLACEMENT OVER MATTAPONI RIVER From: 2.14 Mi. N. Of Rte 600 To: 2.20 Mi.N. Of Rte 600 (Prequalification Required) All questions must be submitted to VDOT using CABB.
Summary: L08_2024 BRIDGE REPLACEMENT OVER MATTAPONI RIVER From: 2.14 Mi. N. Of Rte 600 To: 2.20 Mi.N. Of Rte 600 (Prequalification Required) All questions must be submitted to VDOT using CABB.
Summary: L02_2024 SGR - BRIDGE REPLACEMENT OVER STAUNTON RIVER From: 0.111 Mi. North Of Staunton River To: 0.233 Mi. South Of Staunton River (Prequalification Required) All questions must be submitted to VDOT using CABB.
Lasher Road Bridge Replacement over the Mourning Kill Agency: Saratoga County Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:04/09/2024 Due Date: 04/30/2024 Ad Type:General
Bridge replacement over Castile Creek, 1 mile south of Gower, the total length of improvement being 0.195 miles.
Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.
BRIDGE REPLACEMENT OVER PIGG RIVER IFB : C23-20 Summary Close Virginia Department of Transportation Russ Lawrence Highway Construction Invitation for Bids (IFB) Published On : 1/28/20 Amended On : Closing On : 2/26/20 10:00 AM Intent Posted On: Open Time Left : 27 Days
Bridge replacement over Grindstone Creek, the total length of improvement being 0.236 miles.