Type : Bid Notification
BACKGROUND: This site currently has two 4-ton split unit R-22 HVAC systems. One unit is the original unit from 1985 and a second unit was later installed to replace an original unit. Both units use outdated R-22 refrigerants and must be replaced with R-410 or accepted equivalent. There is an existing concrete pad for each condenser. Site is in the sandy hills southeast of Barstow, CA and requires a 4x4 vehicle to reach the facility. A site visit is scheduled for 05/08/2024 at 08:45 AM PST. Send attendee list with name, company, and contact information for all attendees no later than 05/07/2024 at 5:00 pm PST to Sharon.S.Wu@faa.gov & CC'