Type : Contract
CULVERT REPLACEMENT REMOVE EXISTING CULVERT ON WEST PATROL ROAD AND REPLACE WITH NEW. Solicitation ID/Procurement Identifier: 12445523Q0104 Ultimate Completion Date: Sat Dec 30 18:00:00 GMT 2023
CULVERT REPLACEMENT REMOVE EXISTING CULVERT ON WEST PATROL ROAD AND REPLACE WITH NEW. Solicitation ID/Procurement Identifier: 12445523Q0104 Ultimate Completion Date: Sat Dec 30 18:00:00 GMT 2023
Quinn Building Roof Replacement Remove existing roof and replace with PVC roofing system. Includes standing seam metal wall system on penthouse and new windows at penthouse and HazMat Abatement.
Courts Plus – Locker Room Rooftop Unit Replacement Remove existing rooftop unit serving the locker room and associated adapter curb. Provide new rooftop unit and adapter curb. Reconnect existing gas and electrical services. Replace associated thermostat with new DDC sensor and tie into the existing building automation system. ALTERNATE: Provide alternate price for optional dehumidification control on new rooftop unit.
Category:Requests for Quotation (RFQ) Project Number:5330-02-1032 Published On:April 25, 2024 Closing:May 17, 2024 4:00 pm Status:Open Info: Spruce Grove Field 3 Lighting Replacement The RMOW are seeking bids to remove the existing Metal-halide high-level sports lighting and replace with new LED lights to match or increase the existing illumination levels.
04 April 2024 Steam Tunnel Lighting and Cable Tray Replacement Remove existing cable trays, light fixtures, and other associated accessories in approximately 1,700 LF of steam tunnel running from in front of Reynolds Hall to Stalnaker Hall. 04 April 2024 Released 2/22/2024 12:00 AM EST Type Request for Bid Open 4/4/2024 1:00 AM EDT Number RFB202490000540 Close 4/19/2024 3:00 PM EDT Currency US Dollar Sealed Until 4/19/2024 3:00 PM EDT 04 April 2024
wall between offices behind patrol area to make one office - Install new flooring to match patrol area in new combined office - Paint areas affected as needed Large Office Flooring Replacement - Remove existing flooring - Install commercial grade LVT flooring - Install base trim as needed.Dates of bid will be 8/29/2023 at 4:00pm to 9/5/2023 at 3:00 pm.If you have any questions please call Lt.
SEWAGE GRINDER PUMP REPLACEMENT(REMOVE EXISTING&SUPPLY&INSTALL NEW 3HP OR GREATER GRINDER SEWAGE PUMP IN EXISTING LIFT STATION) Solicitation ID/Procurement Identifier: 1264R420Q0008 Ultimate Completion Date: Wed Sep 30 17:00:00 GMT 2020