Search results for: restoration and reconstruction

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,681
  • RECONSTRUCTION AND RESTORATION OF LANDMARKED AND LANDMARK-QUALITY BUILDINGS

    Type : Bid Notification

    Due : 28 Jun, 2024 (in 1 month)
    Posted : 10 months ago
    Started : 27 Jun, 2023 (10 months ago)

    Description The New York City (the “City”) Department of Design and Construction (“DDC” or the “Department”) is in the process of establishing a pre-qualified list (“PQL”) of contractors for furnishing all labor, materials and equipment, necessary and required to perform small, medium and large reconstruction and restoration work of landmarked and landmark-quality buildings for various capital construction projects.

    From: New York City (City)

  • Sesame Street Reconstruction (220522)

    Type : Bid Notification

    Due : 07 May, 2024 (in 2 days)
    Posted : 15 days ago
    Started : 03 Apr, 2024 (1 month ago)

    This project generally consists of the reconstruction of Sesame Street from County Line Road to the east end with new Portland cement concrete pavement and the installation of a new 12-inch water main. The project also includes driveway removal and replacement, storm sewer improvements, cured-in-place pipe (CIPP) lining, landscape restoration and all related appurtenances and accessories necessary to complete the work.

    From: Christopher B Burke Engineering (Co-op)

  • Niespodziany Ditch Reconstruction

    Type : Bid Notification

    Due : 06 May, 2024 (in 1 day)
    Posted : 16 days ago
    Started : 18 Apr, 2024 (16 days ago)

    [EDT] in the 7 th Floor Commissioner’s Conference Room, County-City Building, South Bend, Indiana, as per Specifications and Plans now on file in the office of the County Engineer, Seventh Floor, Room 732, County-City Building for the following Project: 92401-DRAINAGE – NIESPODZIANY DITCH RECONSTRUCTION This project entails the reconstruction of approximately 7,375 linear feet of the Niespodziany Ditch along a new alignment, two (2), 16-foot span,

    From: St. Joseph (County)

  • Willow Ct SW Reconstruction & 39th St SW Storm Sewer Extension

    Type : Bid Notification

    Due : 07 May, 2024 (in 2 days)
    Posted : 2 days ago
    Started : 17 Apr, 2024 (17 days ago)

    TOPSOIL BORROWC Y130J7347 Willow Ct SW Reconstruction - STREET (350)302575.504ROLLED EROSION PREVENTION CATEGORY 20S Y265J7347 Willow Ct SW Reconstruction - STREET (350)312575.604SITE RESTORATION TYPE 3S Y1,025J7347 Willow Ct SW Reconstruction - STREET (350)322575.604SITE RESTORATION TYPE 6S Y265J7347 Willow Ct SW Reconstruction - STREET (350)332502.5036" PERF PVC PIPE DRAINL F1,004J7347 Willow Ct SW Reconstruction - STREET (350)34S100.546/00010FURNISH

    From: Rochester (City)

  • WO No. 2074 (Donnybrook Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA...

    Type : Bid Notification

    Due : 08 May, 2024 (in 3 days)
    Posted : 16 days ago
    Started : 03 Apr, 2024 (1 month ago)

    MCDR 2024 Subdivision Reconstruction Program WO No. 2074 (Donnybrook Drive): This project includes complete removal of existing pavement and driveways, station grading, storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.

    From: Macomb County Department of Roads (County)

  • Colorado Springs Airport Fire Restoration Reconstruction Main Terminal

    Type : Bid Notification

    Due : 25 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 21 May, 2018 (about 6 years ago)

    Colorado Springs Airport Fire Restoration Reconstruction Main Terminal

    From: Rocky Mountain (Co-op)

  • Emergency Remediation/Mitigation and Restoration and Reconstruction Services

    Type : Bid Notification

    Due : 08 Jun, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 12 May, 2022 (about 2 years ago)

    Contractor will provide the requested services by assessing the damage, developing a restoration plan with the University, executing the agreed- upon restoration plan, fully restoring all affected infrastructure and providing reinstallation of affected property.

    From: University of Maryland Baltimore (Higher Education)