Search results for: restroom and corridor renovations

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 44
  • Administration Building Restroom and Corridor Renovations

    Type : Bid Notification

    Due : 16 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    BidId=86 Pre-Bid Conference: 11/4/21 10:00 AM Pre-Bid Conference Open Responses: 11/16/21 Description: Administration Building Restroom and Corridor Renovations Attachments IFB 22001; Administration Building Restroom and Corridor Renovation.pdf   22001; Administration Building Restroom and Corridor Renovations 10/19/21 AttachmentSizeDescriptionPosted OnTypeIFB 22001; Administration Building Restroom and Corridor Renovation.pdf(206.87 KB)22001;

    From: Virginia (State)

  • Administration Building Restroom and Corridor Renovations

    Type : Bid Notification

    Due : 16 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    BidId=86 Pre-Bid Conference: 11/4/21 10:00 AM Pre-Bid Conference Open Responses: 11/16/21 Description: Administration Building Restroom and Corridor Renovations Amendment/Cancellation Information: 22001; Addendum 1, Pre-Bid Sign-in and Agenda Attachments IFB 22001; Administration Building Restroom and Corridor Renovation.pdf   22001; Administration Building Restroom and Corridor Renovations 10/19/21 22001; Addendum 1 Combined.pdf   Addendum 1;

    From: Virginia (State)

  • Police Tower 6th Floor Renovation

    Type : Bid Notification

    Due : 29 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Jun, 2021 (about 2 years ago)

    The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to provide new office spaces, conference space, workspace, corridor and elevator lobby improvements, and restroom renovations on the 6 th floor of the Waco Police Tower per plans and specifications.

    From: Texas (State)

  • CMR for Deferred Maintenance at DSHS 4 Bldg. Project

    Type : Bid Notification

    Due : 23 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 17 May, 2022 (23 months ago)

    General DM renovations call for the removal of hazardous materials found under the corridor floor and above the ceilings in insulation and mastic around ductwork and Variable Air Valve (VAV) boxes. The DM renovations concentrate on bringing the corridors into code compliance and replacing the VAV boxes and controls on each floor. DM renovations in F Building address the office and restroom areas only and exclude the Café.

    From: Texas (State)

  • Break Room Renovation

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 4 days)
    Posted : 20 days ago
    Started : 28 Mar, 2024 (21 days ago)

    The Society’s failure to exercise their rights to terminate under this provision shall not be construed as a waiver of their rights to terminate, rescind or revoke the services herein in the event of any subsequent breach. 3.15.02 Termination for Convenience: The Society, by written notice, may terminate this contract in whole or in part, when it is in the best interest of the Society. 3.16.00 ILLEGAL IMMIGRATION & PUBLIC CONTRACTS 3.16.01 By signing

    From: Riverbanks Zoo Garden (Other)

  • TASK ORDER 2031JG21D00035-2031JG22F00041-RESTROOM RENOVATION ( ROOM 221)

    Type : Contract

    Due : 30 Sep, 2026 (in about 2 years)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    TASK ORDER 2031JG21D00035-2031JG22F00041-RESTROOM RENOVATION ( ROOM 221) Solicitation ID/Procurement Identifier: 2031JG21D00035 Ultimate Completion Date: Wed Sep 30 17:00:00 GMT 2026

    From: Federal Procurement Data System (Federal)

  • Z2DA--Expand & Upgrade Building 42 for Laboratory, P/N 657-502

    Type : Bid Notification

    Due : 21 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 10 Feb, 2020 (about 4 years ago)

    The west side of the ground floor is a connecting corridor between the new south exterior entrance and the end of the existing corridor in Building 42. Interior renovations are limited to material transitions at corridors on the Ground floor and Basement Floor tunnel from new to existing construction. The existing laboratory department and phlebotomy clinic will remain in operation for the duration of the Lab addition construction.

    From: Federal Government (Federal)